My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NEWTON
>
4020
>
2900 - Site Mitigation Program
>
PR0517220
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2020 3:53:54 PM
Creation date
4/1/2020 3:48:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0517220
PE
2950
FACILITY_ID
FA0013231
FACILITY_NAME
COYNER EQUIPMENT CO INC
STREET_NUMBER
4020
STREET_NAME
NEWTON
STREET_TYPE
RD
City
STOCKTON
Zip
95205
CURRENT_STATUS
01
SITE_LOCATION
4020 NEWTON RD
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br /> Coyner Property May 2001 <br /> Project No. 75.25729.0002 Page 5 <br /> PROJECT SAFETY PLAN <br /> FOR <br /> COYNER PROPERTY <br /> 4020 NEWTON ROAD <br /> STOCKTON, CALIFORNIA <br /> 1. INTRODUCTION <br /> This Project Safety plan delineates the basic safety requirements for the completion of ten soil borings <br /> at the facility located at 4020, Stockton, County of San Joaquin, California (Figure 1). <br /> The site is a light industrial facility. The leach lines on the premises may have had petroleum <br /> hydrocarbons or pesticides discharged into them. ATC Associates Inc.'s (ATC's) work will include <br /> the drilling, sampling, and logging often soil borings. <br /> The provisions set forth in this plan will apply to the employees of ATC and its subcontractors <br /> working on the project. The subcontractors may elect to modify these provisions, but only to upgrade <br /> or increase the safety requirements, and only with the concurrence of ATC as designated and accepted <br /> in writing. <br /> The plan addresses the expected potential hazards that may be encountered during this project. Field <br /> activities will be scheduled with the San Joaquin County Public Health Services and are expected to <br /> last for approximately one day. If changes in site or working conditions occur as the activities process, <br /> amendments to this plan will be provided by ATC. <br /> 2. PROJECT SAFETY AUTHORITY <br /> Personnel responsible for the project safety are: James A. Lehrman, Project Manager and David <br /> Oliver, Project Geologist. <br /> The Project Manager/Project Geologist is responsible for reviewing and authorizing the provisions of <br /> this plan. He has the authority to provide for the auditing of compliance with the provisions of this <br /> plan, suspend or modify work practices, and to administer disciplinary actions for individuals whose <br /> conduct does not meet the requirements set forth herein. The Project Manager/Project Geologist will <br /> ensure that the following items are adequately addressed: <br /> ■ Safety Supplies and Equipment Inventory <br /> ■ Medical Surveillance Program/Physical Examinations <br /> ■ Training Programs/Hazard Communication <br /> ■ Accident/Incident Reporting Procedures <br /> ■ Decontamination/Contamination Reduction Procedures <br /> C:N9yD cmmn6\AT Fda\Wo Fda\Stmkton SiwOockron H SP.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.