My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
18678
>
2900 - Site Mitigation Program
>
PR0517377
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:59:15 PM
Creation date
4/1/2020 3:57:10 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0517377
PE
2965
FACILITY_ID
FA0013386
FACILITY_NAME
CALIFORNIA CONCENTRATE CO
STREET_NUMBER
18678
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
CURRENT_STATUS
01
SITE_LOCATION
18678 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Notwithstanding,JHC will report data between the MDL and PQL (i.e.J <br /> values) for information purposes only. The project data objectives will be <br /> met, and the site WDR concentration limits will be satisfied. <br /> 6.4 Analytical Methodologies <br /> The analytical methodologies to be used by the laboratory for all of the <br /> parameters are required in the facility monitoring program. All methods <br /> are U.S.EPA approved and are fully described in the laboratory method <br /> and standard operating procedure documents. <br /> Califonua Concentrates Monitoring Well Work Plan Issued: June 8,2001 <br /> JHC Project No.493-01 12 Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.