My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
3978
>
2900 - Site Mitigation Program
>
PR0518304
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:56:54 PM
Creation date
4/1/2020 4:02:50 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0518304
PE
2950
FACILITY_ID
FA0013818
FACILITY_NAME
LOW PRICE AUTO GLASS
STREET_NUMBER
3978
Direction
S
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95205
APN
17917103
CURRENT_STATUS
01
SITE_LOCATION
3978 S HWY 99
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
411
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan For Well <br /> ARCADIS Destructions <br /> Chevron Site ID 309075 <br /> January 2,2013 <br /> 5.0 SCHEDULE <br /> ARCADIS is-prepared to initiate field work upon the approval of this work plan by the SJCEHD <br /> and the issuance of necessary permits.Once permits,are received,we expect the scope of work. <br /> to be completed within 6-8 weeks and a,well destruction report submitted within 30 days of field <br /> work completion. <br /> If you have any questions or comments regarding the contents of this work plan, please contact <br /> Brian Westhoff of ARCADIS at 916.865:3131 ext. 22 or by e-mail at Brian.WesthoffQarcadis- <br /> us.com. <br /> Sincerely, __,. <br /> ARCADIS k�����ONA! �Folo <br /> BRIAN D. U, <br /> WESTHOFF <br /> N10.8784 ° <br /> Amber V. Nickens Brian Westhoff, P.G. <br /> Staff Scientist Senior Geologist r>�0F CA\-\F��� <br /> Enclosures: <br /> Figure 1 Site Location Map <br /> Figure 2 Site Plan <br /> Table 1 Well Construction Details <br /> Appendix A Boring Log <br /> cc: Mr. Brian Waite, Chevron Environmental Management Company <br /> Mr. James Barton, Regional Water Quality Control Board <br /> Mr. Romeo Yacoub, Property Owner <br /> G:\Aproject\ENV\CHEVRON\309075\6 Dellverables\Work Plan\Well Destruction\309075 Work Plan for Weil bestructions_ML 0102.2013.doc 4 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.