Laserfiche WebLink
UPDATED CONDITIONS OF APPROVAL <br /> PA-1300118 <br /> PHILLIPS FARMS, LLC/MICHAEL D. HAKEEM <br /> A one-year Time Extension for Revisions of Approved Actions for Use Permit Application No. PA- <br /> 1300118 was approved by the Planning Commission on June 18, 2020. The effective date of approval <br /> is November 1, 2018. This approval will expire on May 1, 2820 2021, which is 4-8 30 months from the <br /> effective date of approval, unless (1) all Conditions of Approval have been complied with, (2) all <br /> necessary building permits have been issued and remain in force, and (3) all necessary permits from <br /> other agencies have been issued and remain in force. <br /> Unless otherwise specified, all Conditions of Approval and ordinance requirements shall be fulfilled <br /> prior to the establishment of the use and the issuance of any building permits. Those Conditions <br /> followed by a Section Number have been identified as ordinance requirements pertinent to this <br /> application. Ordinance requirements cannot be modified, and other ordinance requirements may <br /> apply. <br /> 1. COMMUNITY DEVELOPMENT DEPARTMENT(Contact: [209]468-3121) <br /> a. BUILDING PERMIT: Submit an"APPLICATION-COMMERCIAL BUILDING PERMIT". The Site Plan <br /> required as a part of the building permit must be prepared by a registered civil engineer or licensed <br /> architect. This Plan must show drainage, driveway access details including gates, on-site parking, <br /> landscaping, signs, existing and proposed utility services, and grading (refer to the "SITE PLAN <br /> CHECK LIST'for details).A fee is required for the Site Plan review. (Development Title Section 9-884) <br /> b. APPROVED USE: This approval is for the expansion of a large winery to be built in four(4) phases <br /> over fifteen (15)years as shown on the Revised Site Plan dated DeGernber 5 October 3,2017 <br /> (Use Type: Wineries and Wine Cellars—Winery, Large). Twenty-five (25) Marketing Events per year <br /> are also approved with a maximum attendance of 450 300 people as shown on the proposed <br /> marketing plan dated July 15, 2013. <br /> • Phase 1, building permits to be issued within eighteen (18) months from the effective date of <br /> approval, includes the construction of a 7,000-square-foot office building and the conversion of <br /> an existing 10,000-square-foot agricultural building into a winery production building. <br /> • Phase 2, building permits to be issued within five (5) years from the effective date of approval, <br /> includes the construction of a 24,000-square-foot barrel warehouse building, a 600-square-foot <br /> crush pad, wine tank farm expansion, and a 900-square-foot restroom building. <br /> • Phase 3, building permits to be issued within ten (10)years from the effective date of approval, <br /> includes the construction of a 24,000-square-foot barrel warehouse building, a 24,000-square- <br /> foot case goods storage building and wine tank farm expansion. <br /> • Phase 4, building permits to be issued within fifteen (15) years from the effective date of <br /> approval, includes the construction of a 24,000-square-foot barrel warehouse building. <br /> PA-1300118— Updated Conditions of Approval 1 <br />