Laserfiche WebLink
MDE&GNERSIW4SULTAWS 83 WEST MARCH LANESUITE 12 <br /> STOCKTON,CA 95207 <br /> sm PHONE:(209)476-1635 rn & M STOVE INC. <br /> MANAGERS <br /> January 27, 1993 <br /> Mr. Theodore I. Wittmayer <br /> Attorney at Law <br /> Stone Brothers and Associates <br /> 1024 West Robinhood Drive W.O. No. 06498-002 001 <br /> Stockton, CA 95207 Task Order 5 <br /> SUBJECT: Review and Advisory — Work Plan for Phase V Subsurface Invesilgation <br /> dated September 25, 1992 and Amendment to Phase V Subsurface In estiga- <br /> tion Work Plan, dated December 31, 1992, Montgomery Ward Auto ervice <br /> Center, 5400 Pacific Avenue, Stockton, CA, Site Code 2163 <br /> Dear Mr. Wittmayer, <br /> On behalf of Stone Brothers and pu ssuant to your request in your letter of January 1�' 1993, <br /> ROY F. WESTON, INC. (WESTON) has reviewed the above referenced work plan d work <br /> plan amendment which describe the proposed soil and groundwater investigation activities at the <br /> Montgomery Ward (Ward) Auto Service Center in Stockton. The two subject documents were <br /> prepared by Environmental Audit, Inc. (EAI), a consulting firm which has been retained by <br /> Ward to conduct the site investigation of the former underground storage tank (UST) site. <br /> The objectives of WESTON's review were as follows: <br /> 1. Review the documents to determine the scope of the proposed work; <br /> 2. Advise Stone Brothers as to the adequacy of the proposed work. <br /> In addition to the review of the two subject documents, WESTON reviewed a letter from the San <br /> Joaquin County Public Health Services Environmental Health Division (EHD) to Stone I Irothers <br /> dated November 19, 1992, which required the submittal of the Phase V work plan am ndment <br /> in response to review of the Phase V work plan. The letter was provided to WESTON by the <br /> EHD. <br /> To facilitate discussion of issues and facilities on the site, WESTON will designate the area <br /> around the former UST as Area 1 and the area around the former gasoline pump island and <br /> boring B-9 as Area 2. Please refer to the attached site map from the EAI work plan for the <br /> location of specific site features. <br /> Phase V Work Plan Summary <br /> The EAI Phase V work plan summarizes the work conducted to date on the site and re 7erences <br /> several previous reports for more specific information on the findings of earlier investigation <br /> MXC1RMS\WITMYRI.WP <br />