My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1985-1997
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5400
>
2900 - Site Mitigation Program
>
PR0522692
>
SITE INFORMATION AND CORRESPONDENCE_1985-1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2020 2:47:19 PM
Creation date
4/2/2020 2:16:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1985-1997
RECORD_ID
PR0522692
PE
2957
FACILITY_ID
FA0015465
FACILITY_NAME
FORMER MONTGOMERY WARDS AUTO SRV CTR
STREET_NUMBER
5400
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227008
CURRENT_STATUS
01
SITE_LOCATION
5400 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
401
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M & M STONE, INC. <br /> DRAFT JUSTIFICATIONSTATEMENT SEP 2 2 1992 <br /> September 15, 1992 ENVIRONMENTAL HE/�LTH <br /> PERMIT/SERVICES <br /> SITE: Former UNOCAL Station No. 5098 <br /> 5606 Pacific Avenue <br /> Stockton, California <br /> This report is written according to the consensus reached during a meeting at <br /> the Environmental Division office an February 7, 1992, regarding the final <br /> disposition of monitoring wells (MW) #3, 4, 5, and 9, on the subject property. <br /> February 7. 1992 Meeting <br /> In the meeting, Stone Bros. agreed to prepare a "Draft Justification <br /> Statement" regarding the feasibility of locating and properly destroy- <br /> ing MW4 and MW5, given the fact that a new commercial building has <br /> since been erected on the site. Stone Bros. also agreed to research <br /> its records, and speak with its construction personnel about Stone <br /> Bros. construction work on the new parking lot and building in the <br /> areas of MW3 and MW9 to ascertain whether any evidence was found, or <br /> contact made with either of these wells. <br /> Attending the February 7, 1992 meeting were the following: <br /> A. Environmental Health Division: <br /> Diane Hinson <br /> Michael Infurna <br /> B. Stone Bros. & Associates: <br /> Jay Allen Mary Jensen <br /> Ted Wittmayer Wayne Richmond <br /> Brooke Birke (Neumiller & Beardslee) <br /> C. UNOCAL: <br /> Jerry Mason Ralph Legg <br /> Ron Bock (Kaprealian Engineering) Lois Ellen Goltz <br /> Tim Ross (Kaprealian Engineering) <br /> Two major issues were discussed: (1) Disposition of the existing <br /> wells, and (2) Water contamination remediation plan. Regarding the <br /> disposition of existing wells, there was general agreement that MW4 <br /> and MW5 were most likely destroyed in the initial site excavation, <br /> ramping, and grading which was completed according to KEI's approved <br /> remediation plan for UNOCAL between September 19, 1988 and December <br /> 12, 1988. <br /> b: \mwj-#12\Site-Rep.ort <br /> Printed: September 22, 1992 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.