My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0081859_SSNL
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
10331
>
2600 - Land Use Program
>
SR0081859_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:52:08 PM
Creation date
4/2/2020 2:20:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SR0081859
PE
2602
STREET_NUMBER
10331
Direction
N
STREET_NAME
STATE ROUTE 99
STREET_TYPE
RD
City
STOCKTON
Zip
95212
APN
12203008
ENTERED_DATE
3/9/2020 12:00:00 AM
SITE_LOCATION
10331 N HWY 99 FRONTAGE RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
02 March 2020 AdvancedGeo <br /> Project No. 20-5001 An Employee-Owned Company <br /> Page 13 of 14 � <br /> 9.7. IMPACT OF NITROGEN LOADING FROM SITE PROJECT TO <br /> DOWNGRADIENT WATER SOURCES <br /> The recharging of groundwater is the most likely potential feature that could impact future <br /> nitrogen loading. Since the subject property is flat, AGE does not anticipate percolating <br /> effluent will affect any nearby water sources. Based on the volume of wastewater to be <br /> generated, the potential vertical migration would not likely degrade the local groundwater. <br /> A total of 10.17 ppm of additional nitrogen is estimated to be added to the site over the <br /> long term through wastewater recharge from the proposed septic system. The nitrogen <br /> loading value is nearly equal to the desired value of 10 ppm. <br /> 10.0. TOTAL NITRATE IMPACT FROM PROPOSED PROJECT <br /> Based on the method and assumptions described, proposed NO3_N mass of wastewater <br /> and the calculations of the NO3_N loading predicted, the proposed development may <br /> negatively impact NO3_N loading rates within the aquifer. The soil at the site appear to <br /> be adequate for nitrate degradation and proper leaching of wastewater. A total of <br /> 10.17 ppm of additional nitrogen is estimated to be added to the site over the long term <br /> through wastewater recharge from the proposed septic system. <br /> 11.0. MITIGATION METHODS PROPOSED <br /> To mitigate any known or potential future impacts to soil and groundwater of nitrate from <br /> the existing and proposed septic systems, the following mitigations could be <br /> implemented: <br /> • Maximize wastewater hold time where practical (retention). <br /> • Avoid use of bioattenuation chemicals (bleach etc.). <br /> • Properly and regularly maintain property septic systems. <br /> • Use EHD criteria for sizing the septic disposal field. <br /> If re-location or expansion of leach fields becomes necessary, leach lines should include <br /> high organic substrates under and surrounding the lines installed. <br /> 12.0. CONCLUSIONS AND RECOMMENDATIONS <br /> Based on this Soil Suitability and Nitrate Loading Study, AGE concludes the following: <br /> • The percolation rate meets the minimum EHD standards in the proposed septic <br /> system disposal field. <br />
The URL can be used to link to this page
Your browser does not support the video tag.