My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_1998-2000
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5400
>
2900 - Site Mitigation Program
>
PR0522692
>
SITE INFORMATION AND CORRESPONDENCE_1998-2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2020 2:38:48 PM
Creation date
4/2/2020 2:21:27 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1998-2000
RECORD_ID
PR0522692
PE
2957
FACILITY_ID
FA0015465
FACILITY_NAME
FORMER MONTGOMERY WARDS AUTO SRV CTR
STREET_NUMBER
5400
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227008
CURRENT_STATUS
01
SITE_LOCATION
5400 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
293
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUN-01-2004 15:42 9362 8109 916 362 8108 P.99 <br /> CLEANUP AND ABATEMENT ORDER NO. S-00-707 <br /> I-ORMER UNOCAL AND MONTGOMERY WARDS <br /> 5606 AND 5400 PACIFIC AVF.NTTF, STOCKTON <br /> SAN JOAQUIN COUNTY <br /> d. Pollutant concentration contour maps for 7"PHg and benzene (shall6w and desp'). <br /> C. Tabular listing of all monitoring well details. <br /> f. Tabular results of current sampling data completed during the previous quarter. <br /> g. Tabular result of and all previous data collected including current sampling data. <br /> h. Groundwater purge data sheets. <br /> i. Narrative describing the work presented in the report, including methodology, <br /> conclusions, and recommendations. <br /> j. Discussion of the status of investigation and cleanup activities. <br /> k. Evaluation of the effectiveness of cleanup activities and an estimate of pollutants treated <br /> versus pollutants remaining(may be submitted quarterly as an ancillary report). <br /> 1. A schedule for future activities. <br /> rn. lnclude data from the last three months, document treatment or disposal of any <br /> contaminated soil or groundwater generated during the investigation and cleanup <br /> activities. <br /> 15. If groundwater monitoring indicates the groundwater plume has migrated beyond laterally or <br /> vertically defined limits during the quarter, the quarterly report shall include a work plan and <br /> schedule, with work to begin within thirty days of report submittal, to define the new plume <br /> limits and cease the plume movement. <br /> Dated S September 2000 <br /> Y . CARLTON, xecutive OfCtcer <br /> TOTAL P.99 <br />
The URL can be used to link to this page
Your browser does not support the video tag.