Laserfiche WebLink
09/11/2001 11:42 71463267 EAI • PAGE 08 <br /> Rug 29 01 11: 02a R' 4 Managemmmt 20 954 S066 P-B <br /> SCHEDULE II-PUMPING PLANT <br /> 1 1 EA DEMOLITION&SITE WORK $15,000.00 $15,000 <br /> 2 1 EA. 75 HP SUBMERSIBLE PUMP $19,000.00 $19,000 <br /> 3 1 EA. 1o,000 GALASME TANK&APPURT $100000 $$34,000 <br /> 4 1 EA. WATER METER <br /> 5 1 EA. ELECTRICAL CONTROLS $9,000.00 $9,DD0 <br /> 6 1 EA. MISC.PIPING&VALVES $6,500.00 $6,500 <br /> 7 1 EA FENCING $8,000.00 $8,000 <br /> $ 1 EA. LANDSCAPE RESTORATION $4,500.00 $4,500 <br /> TOTAL SCHEDULE:-----> $102,100 <br /> SCHEDULE 111-ABANDONMENT OF OLD WELL <br /> 1 i E4. REMOVE&DISPOSE OF TANK $3,000.00 $3,000 <br /> 2 1 EA. REMOVE&DISPOSE OF ELECTRICAL $2,000.00 $2,000 <br /> 3 1 EA. DEMOLISH STORM CONNECTION $1,500.00 $1,500 <br /> 4 1 EA. LS SURFACE REPAIR $2,000.00 $2,000 <br /> 5 1 EA. CLEANUP $1,000.00 $1,000 <br /> TOTAL SCHEDULE:-----> $9,500 <br /> SCHEDULE 1IN-ELECTRICAL SERVICE <br /> 1 1 EA. 12 KVA TFR 75 HP,480 V $12,000.00 $12,000 <br /> 2 40 LF 12 KVA LINE $25.00 $1,000 <br /> TOTAL SCHEDULE:-----> $13,000 <br /> SCHEDULE V-INTERCONNECT PIPING <br /> 1 575 LF 6'C900,CL 150 PVCP $23.00 $13.225 <br /> 2 4 EA, 6,,GATE VALVE ASSEMBLY $550.00 $2,200 <br /> 3 1 EA. 4"GATE VALVE ASSEMBLY $400.00 $400 <br /> 4 1 EA, PRESSURE RELIEF VALVE ASSEMBLY $1,250.00 $1,250 <br /> $ 1,725 SF PAVEMENT REPLACEMENT $2.00 $3.450 <br /> 6 50 EA, CURB REPLACEMENTS $19.25 $983 <br /> 7 1 EA LANDSCAPE REPLACEMENT $1,000.00 $1,000 <br /> TOTAL SCHEDULE:-----> $22,488 <br /> TOTALALLSCHEDULES $301,188 <br /> DESIGN ENGINEERING $36,143 <br /> CONSTRUCTION SURVEYING $8.283 <br /> BID ASSISTANCE $3,765 <br /> CONSTRUCTION MANAGEMENT&OBSERVATIONS $9,036 <br /> QUALITY CONTROL TESTING $3,500 <br /> CONTINGENCY 15% $45,178 <br /> TOTAL ESTIMATED CONSTRUCTION COST $407,091 <br /> Included in the cost estimate are costs for upgrading main ilnes from 4"to 6". <br /> Increasing the size of several sections of the irrigation main line is needed to <br /> reinforce the west side of the irrigation loop and prohibit flow velocity from <br /> exceeding 5 feet per second. <br /> 4 <br />