Laserfiche WebLink
- t <br /> 04/26/2001 12:23 714632 r EAI PAGE 03 <br /> M. Tnfurzza EAI Project No. 1232 <br /> r <br /> April 26, 2001 <br /> Page 2 f <br /> I <br /> Insert wire-line charges placed as follows: <br /> i <br /> i <br /> -15 to-40 feet 6 charges <br /> -55 feet 1 charge <br /> -74 to-94 feet 5 charges <br /> -110 feet 1 charge <br /> -121 to-181 feet 13 charges <br /> -240 feet 1 charge i <br /> -220 feet 1 charge <br /> -240 feet 1 change <br /> -260 feet 1 charge <br /> -277 to-297 feet 5 charges <br /> -315 feet I charge <br /> For intervals requiring multiple charges, charges will be set at five-foot intervals, <br /> which will destroy the casing rather than, just perforate the casing_ The well will-be <br /> tremie grouted from the bottom up and topped off. This procedure will be repeated <br /> until the grout level no longer drops. <br /> • Insert tremie pipe from bottom of well to top, and pump nine(9) sack sand and cement <br /> from bottom to five (5) feet bgs. <br /> • Remove tremie pipe. <br /> • Detonate wire line charges. <br /> • Fill up well with grout and mushroom cap to 1.0 feet bgs_ F <br /> + Backfill excavation with clean fill. <br /> • Remove four(4)5,000-gallon storage tanks(non-petroleum). <br /> * Remove tank supports. <br /> • Remove electrical panels_ <br /> • Cleanup and leveling of gravel mix pad to align with surrounding pad. <br /> i <br /> Please review and let us know if this method is acceptable to the PHS-EBD for destruction of <br /> the R1W- i <br /> i <br /> i <br /> (this space intentionally left blank) <br /> i <br /> I <br /> i <br /> EI MRONMI L AUDIT,INC-(D <br /> i <br /> i <br /> i <br />