My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_2001-CURRENT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5400
>
2900 - Site Mitigation Program
>
PR0522692
>
SITE INFORMATION AND CORRESPONDENCE_2001-CURRENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2020 3:01:51 PM
Creation date
4/2/2020 2:25:08 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2001-CURRENT
RECORD_ID
PR0522692
PE
2957
FACILITY_ID
FA0015465
FACILITY_NAME
FORMER MONTGOMERY WARDS AUTO SRV CTR
STREET_NUMBER
5400
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227008
CURRENT_STATUS
01
SITE_LOCATION
5400 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
701
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
When I get the check and the LCD I will issue the permit. I will bring your copy to the jobsite the day of <br /> the destruction. Call me to schedule the date and time. <br /> From: Lheureux, Robert [mailto:RLheureux@ensr.aecom.com] <br /> Sent: Thursday, February 15, 2007 4:46 PM <br /> To: Mike Infurna [EH] <br /> Cc: Siegel, Eric <br /> Subject: RE: Emailing: Decommissioning Work Plan 2-15-07.pdf <br /> Mike, <br /> Thanks. Yeah, it will definitely be pressure applied grouting. <br /> I'll have Eric call Gregg immediately. The check for the permit fee ($60) is in the mail. ENSR <br /> will email you a copy of the signed (authority to sign) permit and a photocopy of the signed <br /> check. <br /> Please continue to bill ENSR regarding this project. The billing address is included below. <br /> Thanks, <br /> Rob <br /> Robert P. L'Heureux <br /> Project Engineer <br /> ENSR International <br /> 10461 Old Placerville Road, Suite 170 <br /> Sacramento, California 95827-2508 <br /> P: 916.362.7100 <br /> F: 916.362.8100 <br /> Direct Line: 916.288.4314 <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Thursday, February 15, 2007 4:20 PM <br /> To: Lheureux, Robert <br /> Cc: Jim Barton <br /> Subject: RE: Emailing: Decommissioning Work Plan 2-15-07.pdf <br /> Robert, <br /> The work plan looks ok. <br /> Thanks for the revision. I assume that the idea of actually applying <br /> pressure was intended some where in there, although I never actually <br /> read it. I can live with it as is, but in the future please include <br /> some verbiage that actually states pressure will be applied to the <br /> casing after the grout has been introduced until no more grout can be <br /> taken. It's the pressure that makes this method and it is also <br /> commonly a problem that needs additional help in the field to properly <br /> destroy the well. Check with your driller to ensure "pressure" can be <br /> applied and maintained in the field. <br /> The work plan is approved. <br /> Please get Greg Drilling to authorize ERIC SIEGEL signing on their <br /> behalf. The EHD form, "LCD" included in your packet to me DID NOT have <br />
The URL can be used to link to this page
Your browser does not support the video tag.