Laserfiche WebLink
Mike Infurna [EH] <br /> From: Jim Barton pbarton@waterboards.ca.gov] <br /> Sent: Monday, November 15, 2004 7:43 AM <br /> To: bheningburg@ENSR.com <br /> Cc: Mike Infuma [EH] <br /> Subject: RE: Work Plan for 5400/5606 Pacific Ave, Stockton - Drilling Notification <br /> Thanks for the notice, Ben. I will not be available to visit the site. <br /> Jim Barton <br /> Please note the email change: jbarton@waterboards.ca.gov. <br /> James L.L. Barton, R.G. <br /> Engineering Geologist <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 11020 Sun Center Drive, Suite 200 <br /> Rancho Cordova, CA 95670 <br /> office (916) 464-4615 <br /> fax (916) 464-4797 <br /> >>> "Heningburg, Ben" <bheningburg@ENSR.Com> 11/11/04 04:26PM >>> <br /> Linda, <br /> Just to make everyone aware of the items we discussed today. <br /> 1. Both GHH and Stone Bros. have reviewed ENSRs well installation work plan <br /> dated 11/2/04 and neither party objects to the proposed well locations for <br /> MW-31 and MW-32. . <br /> 2. Underground Service Alert was called in today. The confirmation number <br /> is 427646. <br /> 3. Drilling will commence on 11/16/04 @ 6 a.m. and is scheduled to be <br /> completed on 11/17/04 @ 5 p.m. <br /> Thanks for your assistance. <br /> From: Linda Cramer [mailto:lcramer@ghheng.com] <br /> Sent: Wednesday, November 03, 2004 12:47 AM <br /> To: Ben Heningburg <br /> Cc: Gary Hall; Jay Allen <br /> Subject: Work Plan for 5400/5606 Pacific Ave, Stockton <br /> Ben, <br /> I just received and reviewed the ENSR Site Conceptual Model, QMR, <br /> Remediation Status, Well Installation/Destruction Report, (Report) dated <br /> October 29. Could you please provide me with more detail regarding ENSR <br /> plans to conduct a pilot study and install additional monitoring wells, <br /> described on page 9 of the Report. Specifically, I am interested in <br /> proposed MW locations and construction dates as well as the schedule and <br /> space requirements for the pilot test. <br /> With the busy holiday shopping season upon us, our client is understandably <br /> concerned about impacts to parking and site access at the property. If ENSR <br /> could take measures to minimize the impact to shoppers and site tenants <br /> resulting from ENSR activities, it would be appreciated. Thank you in <br /> advance for keeping us in the loop. <br /> 1 <br />