' Fmr. Unocal • - 2 - • 21 December 2007 <br /> 1 Fmr' Montgomery Wards <br /> 5400-5606 Pacific St., Stockton <br /> tComments: <br /> The Workplan is sufficient for the proposed.work. However, there is no detailed discussion in <br /> the Workplan of how ENSR and CEMC came to the conclusion that the existing AS/SVE <br /> system was inadequate (the evaluation), nor was the technical data provided of the individual <br /> ' well testing that was done to reach that conclusion. Nevertheless, I do appreciate the time <br /> and effort that ENSR and CEMC put into the Workplan; and I will concur with it when the <br /> following conditions are met: <br /> ' It is my understanding from previous conversations with ENSR that there is a question <br /> whether the treatment system could adequately affect the groundwater plume to the <br /> ' north under Robinhood Drive. Please submit a lettgr addendum to the Workplan, which <br /> provides a detailed explanation of the existing SVEJ'AS system testing procedures, <br /> conipares the"testing results to the expected pe4ormance specifications for a`similar <br /> ' designed system, and shows that the entire groundwater plume will be addressed by <br /> the proposed upgrades. In other words, the technical justification for replacing all, or a <br /> portion of, the existing system needs to presented in'a manner thatthe State Water <br />! ' Resources Control Board, Underground Storage Tanks Cleanup Fund and Regional <br /> Board staffs can concur to"ENSR's and CEMC's determination that the upgrades are <br /> necessary and appropriate. <br /> ' The Workplan does not include labeled geologic cross sectional views of the <br /> remediation well construction and the lithological sequence to be remediated. Submit <br /> two geologic cross sections oriented as an "X" (at right angles), and include the <br /> proposed remediation wells, along with the existing remediation and monitoring wells, <br /> within the lithology of the remediated zones. <br /> ' Revise the map or plan view to include the lines of above cross sections indicated as an <br /> "X "on Attachment B Figure 2 (attached). <br /> Submit a tentative schedule with dates for the proposed fieldwork and reports, so that I <br /> ' may input the proposed work into GeoTracker as milestones to be completed. <br /> Add Regional Board staff to the list of recipients for the well installation activities report. <br /> ' Appendix B, Section 4.0 Schedule currently lists only the California Department of <br /> Water Resources and the San Joaquin County Environmental Health Department <br /> (SJCEHD) as recipients of that report. All reports are to be submitted in paper copy to <br /> tthis office, as well as electronically to GeoTracker (Appendix B Section 3.6). <br /> • Give the SJCEHD and myself at least 3 working days notice for start of fieldwork. <br /> 1 i , <br /> 1 <br />