My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5400
>
2900 - Site Mitigation Program
>
PR0522692
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2020 2:36:03 PM
Creation date
4/2/2020 2:28:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0522692
PE
2957
FACILITY_ID
FA0015465
FACILITY_NAME
FORMER MONTGOMERY WARDS AUTO SRV CTR
STREET_NUMBER
5400
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227008
CURRENT_STATUS
01
SITE_LOCATION
5400 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. James L. Barton <br /> ' January 17, 2008 <br /> Page 3 <br /> ' Comment No.4 <br /> Submit a tentative schedule with dates for the proposed fieldwork and reports, so that I may input the <br /> ' proposed work into Geo Tracker as milestones to be completed. <br /> Response No. 4 <br /> At this time, without the CVWB's complete acceptance of the plans for the AS/SVE upgrade, the <br /> applications to the local agency building and planning departments have not been submitted for the <br /> construction/installation activities. Once those permits have been secured, a schedule with anticipated <br /> dates for field work and reports will be submitted to the CVWB. In the interim, ENSR anticipates the <br /> following time frame: <br /> ' Week of January 14. 2008 <br /> • Submit to the CVWB the Addendum to Work Plan for Air Sparging/Soil Vapor Extraction Well <br /> ' Installation <br /> Week of February 4. 2008 <br /> ' • Receive CVWB acceptance to the Addendum to Work Plan for Air Sparging/Soil Vapor Extraction <br /> Well Installation <br /> • Submit permit application to San Joaquin County Environmental Health Department(SJCEHD)for <br /> ' the installation of air sparge and soil vapor extraction wells <br /> • Submit permit application(s)to building and planning departments <br /> Within 30 days of receipt of SJCEHD permits <br /> • Install air sparge and soil vapor extraction wells <br /> Within 14 days of receipt of building and planning department permits <br /> ' • Commence field activities—decommissioning of existing systems, trenching, and piping <br /> July 2008 (contingent on receipt of building and planning department permits within 10 weeks of <br /> application submittal) <br /> • Initial start-up and testing of AS/SVE system <br /> ENSR proposes to commence field activities immediately upon receipt of appropriate permits for the <br /> ' project, which may result in an earlier time frame than the one presented. ENSR will notify the CVWB of <br /> schedule changes, including delays beyond ENSR's control (local agency review time, drilling company <br /> availability, weather-related down time). <br /> ' Comment No. 5 <br /> ' Add Regional Board staff to the list of recipients for the well installation activities report. Appendix B, <br /> Section 4.0 Schedule currently lists only the California Department of Water Resources and the San <br /> Joaquin County Environmental Health Department(SJCEHD) as recipients of that report. All reports are <br /> ' to be submitted in paper copy to this office, as well as electronically to GeoTracker(Appendix B Section <br /> 3.6). <br /> t01231-154 <br />
The URL can be used to link to this page
Your browser does not support the video tag.