My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0007398
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5400
>
2900 - Site Mitigation Program
>
PR0522692
>
ARCHIVED REPORTS_XR0007398
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2020 4:43:26 PM
Creation date
4/2/2020 2:51:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0007398
RECORD_ID
PR0522692
PE
2957
FACILITY_ID
FA0015465
FACILITY_NAME
FORMER MONTGOMERY WARDS AUTO SRV CTR
STREET_NUMBER
5400
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227008
CURRENT_STATUS
01
SITE_LOCATION
5400 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Test Bonng Results—Robinhood Im atlon Well Replacement <br /> Cleanup and Abatement Order No 5-00-707 EAI Protect No 1232 <br />' 4.0 PROPOSED WELL CONSTRCUTION DETAILS <br /> i <br /> Figure 4 presents the proposed new irrigation well construction details The top 200 feet of the <br /> well will be cased off The well will be constructed by drilling to a depth of 200 feet bgs using <br /> a 36-inch diameter drill bit A 30-inch, 0 375 mild steel conductor pipe will then be grouted in <br />' place After the grout has set, the well will be drilled to the total depth, approximately 400 feet <br /> bgs using a 26-inch diameter bit A 163/a-tnch, 40 thousands steel well screen, 50 feet in length <br /> will be placed across the production zone, located at approximately 350 feet bgs The well <br /> screen will be attached to 16-inch 0 250 mild steel pipe that will extend to the surface A 8 x <br /> 16-gravel pack will be placed around the well screen with a bentonite seal on top The <br /> production casing will then be grouted to the surface <br />' The replacement pump and associated system will consist of a 60 Hp VHS Motor, 100 feet of <br /> 10-inch Column with OIL Tube and Shaft, 4 stage 11CHC Goulds Turbine Bowls, and <br /> Electrical Pumping Panel <br /> 1 <br /> 1 <br /> SAB 1232TEST$0R1NG -V- <br /> ENVIRONMENTAL AUDIT, INC.m <br />
The URL can be used to link to this page
Your browser does not support the video tag.