Laserfiche WebLink
T ird Quarter 2000 Ground Water Monitorino Report <br /> Cleanup and Abatement Order No 5-00-707 _ _ EAI Project No 1232 <br /> 2.4 Effluent Handling <br /> All effluent generated during purging, sampling and equipment decontamination activities was <br /> sealed in labeled 55-gallon drums or in an on-site 500-gallon storage tank The water was <br />' stored on the Wards site pending proper disposal <br /> 25 Robinhood Irrigation Well <br /> The RIW was shut down on August 22, 2000, as requested by the RWQCB (see Section 1 1 3) <br /> In order to ensure that the well could not be accidentally reactivated, Delta College cut the <br /> electrical lines to the impeller pump and removed the electrical power source for the pump <br /> However, Delta College left the pump in-place Until the pump is removed, it will not be <br /> possible to sample the RIW No ground water sample was collected from the RIW for <br /> analytical testing <br /> It should be noted that historical analytical data for ground water samples collected from the <br /> RIW (see Table 1) show that contaminants have not been detected to the RIW during periods of <br /> nonuse <br /> BHM 1232Roa92 5 <br />' ENVIRONMENTAL AUDIT, INC <br />