Laserfiche WebLink
Updated Site Conceptual Model and Third Quarter 2003 Monitoring and Remediation Report <br /> Cleanup and Abatement Order No 5-00-707 EAI Project No 1232 <br /> • TABLE OF CONTENTS <br /> TABLES <br /> I HISTORICAL GROUND WATER ANALYTICAL TESTING RESULTS <br /> 2 WELL CONSTRUCTION DETAILS <br /> 3 GROUND WATER ELEVATIONS <br />' 4 CURRENT GROUND WATER ANALYTICAL TESTING RESULTS <br /> 5 VOC FIELD READINGS <br /> 6 OPERATING PARAMETERS <br /> 7 TPH REMOVAL AND DESTRUCTION EFFICIENCY <br /> FIGURES <br />' 1 LOCATION MAP <br /> 2 SITE PLAN <br /> 3 WELL CONSTRUCTION DETAILS <br /> 4 TREND ANALYSIS— MW-2 <br /> 5 TREND ANALYSIS — MW-3 <br /> 6 TREND ANALYSIS — MW-11 <br />' 7 TREND ANALYSIS— MW-12 <br /> 8 UNIT A GROUND WATER ELEVATION MAP <br /> 9 UNIT B GROUND WATER ELEVATION MAP <br /> 10 UNIT A TPH-G ISOCONCENTRATION MAP <br /> I I UNIT B TPH-G ISOCONCENTRATION MAP <br /> 12 UNIT A BENZENE ISOCONCENTRATION MAP <br />' 13 UNIT B BENZENE ISOCONCENTRATION MAP <br /> 14 ANALYTICAL TESTING RESULTS <br /> 15 CROSS-SECTION A-A' <br />' 16 CROSS-SECTION B-B' <br /> 17 CROSS-SECTION LOCATION MAP <br /> APPENDICES <br /> A GETTLER-RYAN STANDARD OPERATING PROCEDURES FOR GROUND <br /> WATER MONITORING <br />' B GETTLER-RYAN FIELD LOGS <br /> C CHAIN OF CUSTODY RECORDS AND LABORATORY REPORTS <br /> • <br />' BHM 1232RO351 -11- <br />