Laserfiche WebLink
' PAGE 1 OF 3 <br /> GROUNDWATER93aimpUtag <br /> Environmental Audit, Inc. DATE 09/ /96 <br />' PROJECT NO 1232 <br /> Planning, Environmental Analyses and Hazardous <br /> Substances Management and Remediation CLIENT Montgomery Ward—Stockton <br />' 1000 QRTEGA WAY, SUITE A W (714) 632 - 8521 WELL NO <br /> PLACENTIA, CA 92670-7125 Ei (714) 632- 6754 WELL DIAMETER INCHES 4"^ <br /> SAMPLED BY AH <br />' o : 1 I0 <br /> ONE CASING VOLUME OF WATER CALCULATED USING THE FOLLOWING WELL VOLUME FACTORS <br />' TOTAL DEPTH OF DEPTH TO WATER DEPTH TO FREE WELL CASING ID inches VOLUME FACTOR <br /> WELL(ft) LEVEL(ft bgs) PRODUCT(ft bgs) 20 0 16 <br /> -69 L] — �7L 40 065 <br /> 60 147 <br /> V. 47 0.65 — <br /> X WELL VOLUME ONE CASING <br /> VOLUME FACTOR VOLUME OF WATcR(CALLONS) <br /> PURGE TIME (hrs} START STOP 6'3C <br /> METHOD DOWN HOLE PUMPxQ DEDICATED PUMP❑ BAILER❑ OTHER❑ <br /> TYP E/MO D E L Grundfos Mp-1 <br /> GALLONSTEMP CONDUCTIVITY TURBIDITY <br />' PURGED ( OF } (Micro-ohms/crn) x 10 PPH (NTU) REMARKS <br /> /O "I G o x z "7.3a o a <br /> - <br /> 2-0 -2 . _ `Z 3f� f8 vS <br /> -731-1 G u6 io `1.3 / Fo <br /> yo 3j2 G 3 Gr,�o` 35 2-0 Ck <br /> 1 f 4 J1 j <br /> i TIME SAMPLED (hrs) b' L{c> I - <br /> i METHOD DOWN HOLE PUMP❑ DEDICATED PUMP❑ BAILER OTHER❑ <br /> TYPE/MODEL Voss Technologies <br /> COMMENTS <br /> I <br />