My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
17000
>
2900 - Site Mitigation Program
>
PR0523467
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 4:26:55 PM
Creation date
4/2/2020 4:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523467
PE
2965 - RWQCB LEAD AGENCY WASTE DISCHARGE SITE
FACILITY_ID
FA0007060
FACILITY_NAME
WINE GROUP, THE
STREET_NUMBER
17000
Direction
E
STREET_NAME
STATE ROUTE 120
City
RIPON
Zip
95366
APN
24506030
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
17000 E STATE ROUTE 120 RIPON 95366
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kennedy Jenks <br /> relative to nearest benchmark at the Facility. Horizontal locations of the new wells will also be <br /> surveyed relative to the California Coordinate system to 0.1 foot. <br /> 2.2.3 Groundwater Sampling <br /> An initial sampling of groundwater will be conducted from the new monitoring wells no sooner <br /> than 72 hours after the newly installed wells have been developed. Groundwater samples will <br /> be collected and analyzed in accordance with the existing MRP. The new wells will be <br /> incorporated into the existing MRP. <br /> 2.2.4 Residuals Management <br /> Residuals generated as a result of these activities are anticipated to include soil cuttings from <br /> the drilling activities, decontamination water resulting from the drilling activities and development <br /> of the monitoring wells, and purge water from sampling of the monitoring wells. The soil cuttings <br /> will be distributed on the ground near each work site. Water residuals will be distributed on the <br /> ground or in the LAA at the Facility, in a manner that does not affect work site safety. <br /> 2.2.5 Quality Assurance / Quality Control (QA/QC) Procedures <br /> Field QA/QC will include collection of one field duplicate sample during each groundwater <br /> sampling event. The results of the duplicate sample will be compared to the primary sample for <br /> consistency. The laboratory will follow their standard internal QA/QC procedures during sample <br /> analysis, including elements such as analyzing method blanks and control spikes where <br /> appropriate. <br /> 2.2.6 Data Review <br /> Analytical data received from the laboratory will be reviewed immediately upon receipt for <br /> completeness and consistency. Any discrepancies will be discussed with the laboratory and <br /> corrective measures will be taken if warranted. <br /> 2.2.7 Reporting <br /> Upon receipt of the laboratory analytical results, a Monitoring Well Installation Report that <br /> summarizes the groundwater well installation and sampling activities will be prepared. The <br /> report will provide: purpose of well installation project; brief description of <br /> geologic/hydrogeologic conditions encountered during installation of the wells; topographic site <br /> map showing facilities, all well locations, and other major physical and man-made features; <br /> drilling details, including soil boring logs and a narrative of field activities; well construction <br /> details; well development information; and a well survey. The report will conclude with an <br /> evaluation of the data collected and, if needed, recommend additional field activities. <br /> A quarterly monitoring report will be issued following each quarterly sampling event. The <br /> quarterly report will include updated groundwater data tables and figures, laboratory analytical <br /> reports, a narrative of the field activities, an evaluation of the data, and, if needed, <br /> recommended additional field activities. <br /> Monitoring Well Installation Work Plan, The Wine Group, Franzia Winery, Ripon, California Page 6 <br /> \\kjc.local\kjc-root\kj-offcelsfolprojects\is-proj1202612665002.00_twg ripon gw men well supportM-reportshwispltwg ripon men well install wp_020426.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.