My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
17000
>
2900 - Site Mitigation Program
>
PR0523467
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2026 4:26:55 PM
Creation date
4/2/2020 4:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523467
PE
2965 - RWQCB LEAD AGENCY WASTE DISCHARGE SITE
FACILITY_ID
FA0007060
FACILITY_NAME
WINE GROUP, THE
STREET_NUMBER
17000
Direction
E
STREET_NAME
STATE ROUTE 120
City
RIPON
Zip
95366
APN
24506030
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
17000 E STATE ROUTE 120 RIPON 95366
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
201
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K Kennedy Jenks <br /> Section 3: Groundwater Monitoring Well Installation Work <br /> Plan Schedule <br /> The work outlined in the Work Plan will be implemented by the following schedule: <br /> • February 2026 — Submit Groundwater Monitoring Well Installation Work Plan to the <br /> CRWQCB <br /> • Receive and respond to comments on Work Plan. <br /> • 45 Days Following Approval of Work Plan - Prepare Health and Safety Plan, select a <br /> licensed drilling contractor, and acquire drilling permits from San Joaquin County. <br /> • 120 Days Following Approval of Work Plan - Install, develop, and survey new wells <br /> (depending on contractor availability). <br /> • 60 Days Following Well Installation — Incorporate new wells into existing MRP and <br /> include data in the next Groundwater Monitoring Report. <br /> • 90 Days Following Well Installation — Submit Monitoring Well Installation Report <br /> (including reviewed laboratory reports and surveyor reports). <br /> Monitoring Well Installation Work Plan, The Wine Group, Franzia Winery, Ripon, California Page 8 <br /> \\kjc.local\kjc-root\kj-offce\sfo\projects\is-proj\2026\2665002.00_twg ripon gw mon well support\09-reports\mwisp\twg ripon mon well install wp_020426.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.