Laserfiche WebLink
Table 1: Summary of Groundwater Monitoring Well Details <br /> Blank Casing Interval Slotted Screen Interval Grout Seal Bentonite Seal Filter Pack <br /> Top of <br /> Drilled Well Casing <br /> Monitoring Completion Depth Diameter Well Elevation Top Bottom Top Bottom Slot Size Top Bottom Top Bottom Top Bottom <br /> Well(a) Date (ft bgS)ibl (in)(`) Type (ft AMSL)idl (ft bgs) (ft bgs) (ft bgs) (ft bgs) (in) (ft bgs) (ft bgs) (ft bgs) (ft bgs) (ft bgs) (ft bgs) <br /> MW-1 10/3/1995 80 4 PVC 76.93 0 50 50 80 0.02 0 40 40 45 45 80 <br /> MW-2 10/6/1995 80 4 PVC 71.21 0 50 50 80 0.01 0 33 33 38 38 80 <br /> MW-3 12/12/2000 56 2 PVC 70.07 0 35.5 35.5 55.5 0.02 0 25 25 32.4 32.4 56 <br /> MW-4 9/9/2004 58.5 2 PVC Pending 0.5 35.2 35.2 55.2 0.01 0.7 30 30 32.6 32.6 56.7 <br /> MW-5 9/10/2004 64 2 PVC Pending 0.3 40.3 40.3 60.3 0.01 0.6 34.6 34.6 37.7 37.7 61 <br /> (a) Summary of construction details for groundwater monitoring wells MW-3 constructed onsite at The Wine Group,Franzia Winery.Details from monitoring wells MW-1,MW-2,and MW-3 are based <br /> on a well construction report provided by The Wine Group personnel and obtained from the Regional Water Quality Control Board. <br /> (b) ft bgs=feet below ground surface. <br /> (c) in=inches. <br /> (d) ft AMSL=feet above mean sea level. <br /> Monitoring Well Installation Work PLan, <br /> The Wine Group,Franzia Winery,Ripon,California Page 1 of 1 <br /> PHIS-Prof\2003-post archive\030120.XV_GW Mon W ell Support\09-Reports\Table 1-2 2025 Work Plan.xlex g <br />