My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
120 (STATE ROUTE 120)
>
17000
>
2900 - Site Mitigation Program
>
PR0523467
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 4:01:48 PM
Creation date
4/2/2020 4:35:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0523467
PE
2965
FACILITY_ID
FA0007060
FACILITY_NAME
WINE GROUP, THE
STREET_NUMBER
17000
Direction
E
STREET_NAME
STATE ROUTE 120
City
RIPON
Zip
95366
APN
24506030
CURRENT_STATUS
01
SITE_LOCATION
17000 E HWY 120
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kennedy/Jenks Consultants <br /> Table of Contents (cont'd) <br /> Chapter 3: Groundwater Monitoring Well Installation Work Plan.............. 3-1 <br /> 3.1 Introduction....................................................................................... 3-1 <br /> 3.2 Groundwater Monitoring Locations and Rationale............................. 3-1 <br /> 3.2.1 Site Hydrology....................................................................... 3-1 <br /> 3.2.2 Existing Groundwater Monitoring Wells................................. 3-2 <br /> 3.2.2.1 Groundwater Analyses......................................... 3-2 <br /> 3.2.3 Proposed Groundwater Monitoring........................................ 3-2 <br /> 3.2.3.1 Locations of Proposed Wells...................:............ 3-2 <br /> 3.3 Field Activities................................................................................... 3-3 <br /> 3.3.1 Pre-Field Activities................................................................. 3-3 <br /> 3.3.2 Installation and Development of Monitoring Wells ................. 3-4 <br /> 3.3.3 Groundwater Sampling.......................................................... 3-5 <br /> 3.3.4 Residuals Management......................................................... 3-6 <br /> 3.3.5 QA/QC Procedures................................................................ 3-6 <br /> 3.3.6 Data Review.......................................................................... 3-6 <br /> 3.3.7 Reporting ............................................................................. 3-6 <br /> 3.4 Groundwater Monitoring Well Installation Work Plan Schedule......... 3-6 <br /> Chapter 4: Process Water Characterization Work Plan............................. 4-1 <br /> 4.1 Introduction........................................ .............................................. 4-1 <br /> 4.2 Process Water Management System Description ............................. 4-1 <br /> 4.2.1 Process Water Stream Identification...................................... 4-1 <br /> 4.2.2 Process Water Management System .................................... 4-2 <br /> 4.3 Process Water Characterization........................................................ 4-2 <br /> 4.3.1 Flow Monitoring..................................................................... 4-2 <br /> 4.3.2 Data Needs ........................................................................... 4-3 <br /> 4.3.2.1 Winery Process Area ........................................... 4-3 <br /> 4.3.2.2 Wine Ion Exchange.............................................. 4-4 <br /> 4.3.2.3 Water Softening ................................................... 44 <br /> 4.3.2.4 Bottling Room ...................................................... 4-4 <br /> 4.3.2.5 Boiler Water Blowdown........................................4-4 <br /> 4.3.2.6 Distillation.............................................................4-4 <br /> 4.3.2.7 Non-Contact Cooling Water................................. 4-4 <br /> 4.3.2.8 Tank and Barrel Sanitation................................... 4-5 <br /> 4.3.2.9 Filter Cleaning...................................................... 4-5 <br /> 4.3.2.10 Vacuum Filter Cake Process Water...................... 4-5 <br /> 4.3.2.11 Centrifuges........................................................... 4-5 <br /> 4.3.3 Sample Collection ................................................................. 4-5 <br /> L 4.3.3.1 Location ............................................................... 4-5 <br /> 4.3.3.2 Technique............................................................ 4-5 <br /> 4.3.4 Data Review........................... .............................................. 4-6 <br /> L, 4.4 Process Water Characterization Work Plan Schedule....................... 4-6 <br /> 1 <br /> 1. <br /> Groundwater Protection Work Plan, The Wine Group ii <br /> - Franzfa Winery, Ripon, California <br /> L. 9S VOW.*wV*ODWA IN :Ic <br />
The URL can be used to link to this page
Your browser does not support the video tag.