Laserfiche WebLink
TABLE OF CONTENTS <br /> 1.0 SOIL SUITABILITY STUDY.............................................................................................3 <br /> 1.1 Introduction and Development.............................................................................3 <br /> 1.1.1 Site Description ........................................................................................3 <br /> 1.1.2 Proposed Development............................................................................4 <br /> 1.1.3 Site Vicinity...............................................................................................4 <br /> 1.1.4 Site Map...................................................................................................4 <br /> 1.2 Present and Past Uses of the Site .......................................................................4 <br /> 1.2.1 Past and Present Site Use........................................................................4 <br /> 1.3 Existing and Proposed Septic Tank Usage ..........................................................5 <br /> 1.3.1 Existing On-Site Septic Tank Usage.........................................................5 <br /> 1.3.2 Site Specific Permit History......................................................................5 <br /> 1.3.3 Discussion of On-Site Septic Tank Repair................................................5 <br /> 1.3.4 Existing Septic Tank Usage in the Vicinity................................................5 <br /> 1.3.5 Septic Permit History in the Vicinity..........................................................5 <br /> 1.3.6 Septic Repair Permit History in the Vicinity...............................................6 <br /> 1.3.7 Expected On-Site Maximum Septic Tank Usage......................................6 <br /> 1.4 Groundwater Information .....................................................................................7 <br /> 1.4.1 Groundwater Depth and Gradient.............................................................7 <br /> 1.4.2 Potential Groundwater Contamination Issues...........................................7 <br /> 1.4.3 Water Sample Location ............................................................................8 <br /> 1.4.4 Groundwater Sample Analysis .................................................................8 <br /> 1.4.5 Groundwater Sample Handling.................................................................8 <br /> 1.5 Soil Profile and Geologic Information...................................................................8 <br /> 1.5.1 Soil Boring Locations................................................................................9 <br /> 1.5.2 Soil Boring Dimensions .........................................................:..................9 <br /> 1.5.3 Soil Lithology Observed............................................................................9 <br /> 1.5.4 Discussion of Soil Lithology......................................................................9 <br /> 1.6 Percolation Test Information ..............................................................................10 <br /> 1.6.1 Percolation Test Locations.....................................................................10 <br /> 1.6.2 Number of Percolation Tests..................................................................10 <br /> 1.6.3 Boring Preparation and Presaturation.....................................................10 <br /> 1.6.4 Condition of Borings after Presaturation.................................................10 <br /> 1.6.5 Percolation Test Procedure....................................................................10 <br /> 1.6.6 Percolation Test Forms and Results.......................................................10 <br /> 1.6.7 Discussion of Percolation Test Results...................................................11 <br /> 1.6.8 Discussion of Septic System Sizing........................................................11 <br /> 2.0 NITRATE LOADING STUDY.........................................................................................11 <br /> 2.1 Chemical and Physical Properties of Soil...........................................................12 <br /> 2.1.1 Chemical and Physical Soil Properties...................................................12 <br /> 2.1.2 Mass Transport Soil Properties ..............................................................12 <br /> 2.2 Groundwater Analysis........................................................................................13 <br /> 2.2.1 Regional Groundwater............................................................................13 <br /> 2.2.2 Potential Ground Water Contamination Issues.......................................13 <br /> 2.2.3 Current and Future On-Site Ground Water Uses....................................13 <br /> 2.3 Sources and Impact of Nitrate to Groundwater..................................................13 <br /> 2.3.1 Current Off-Site Sources of Nitrate.........................................................13 <br /> 2.3.2 Contribution of Rainfall...........................................................................13 <br /> 2.3.3 Current On-Site Sources of Nitrate.........................................................14 <br /> 2.3.4 Future On-Site Sources of Nitrate...........................................................14 <br /> Responsive■ Resourceful ■ Reliable <br />