My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
0
>
2900 - Site Mitigation Program
>
PR0506101
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 1:46:27 PM
Creation date
4/3/2020 1:40:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506101
PE
2960
FACILITY_ID
FA0007202
FACILITY_NAME
CARGILL MOLASSES
STREET_NUMBER
0
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95201
CURRENT_STATUS
02
SITE_LOCATION
PORT RD 8
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTENTS <br /> 1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0 PURPOSE OF PROPOSED WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 3.0 SCOPE OF WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> 3.1 Field Preparations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> L3.2 Asbestos Removal and Disposal . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 3.3 Building Demolition and Debris Removal . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> 3.4 Demolition and Removal of Tanks, Pipes, Fittings, and Ancillary Equipment 4 <br /> 3.5 Excavation, Reduction, and Removal of Concrete and Asphaltic Pavement . 6 <br /> 3.6 Excavation and Removal of Feed Product-Stained Soil . . . . . . . . . . . . . . . . . . . 6 <br /> 3.7 Agronomic Application . . . • • . • . . . . . • • . . . . . . . . . . . • • . . . . . . • • . 7 <br /> 3.8 Backfilling and Compaction 7 <br /> 3.9 Confirmation Soil Sampling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> 3.10 Reports of Results . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> 4.0 HEALTH AND SAFETY PROGRAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8 <br /> L5.0 PROJECT SCHEDULE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 <br /> 6.0 REMARKS AND SIGNATURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 <br /> 7.0 PREVIOUS WORK PLANS AND REPORTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11 <br /> TABLES <br /> Table 1 Project Task Scheduling and Assignments <br /> L <br /> FIGURES <br /> Figure 1 Regional Location Map <br /> Figure 2 Stockton West 7.5 Minute Quadrangle <br /> Figure 3 Port Road No. 8 Facility <br /> APPENDICES <br /> Appendix A Sampling Methodology <br /> Appendix B Quality Assurance <br /> Sierra-Pacific Groundwater Consultants, Inc. i <br />
The URL can be used to link to this page
Your browser does not support the video tag.