My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PORT
>
0
>
2900 - Site Mitigation Program
>
PR0506101
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 1:46:27 PM
Creation date
4/3/2020 1:40:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506101
PE
2960
FACILITY_ID
FA0007202
FACILITY_NAME
CARGILL MOLASSES
STREET_NUMBER
0
STREET_NAME
PORT
STREET_TYPE
RD
City
STOCKTON
Zip
95201
CURRENT_STATUS
02
SITE_LOCATION
PORT RD 8
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> LCONTENTS <br /> 1.0 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0 PURPOSE OF MONITORING WELLS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 3.0 SCOPE OF PROPOSED WORK . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 3.1 Field Preparations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 3.2 Drilling and Logging . . . . . . . . . . . 2 <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 3.3 Well Installations and Development 2 <br /> 3.4 Quarterly Monitoring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 <br /> - 3.5 Analytical Work. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> 3.6 Land Survey 4 <br /> 3.7 Report Writing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 <br /> L 4.0 HEALTH AND SAFETY PROGRAM . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 5.0 PROJECT SCHEDULE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 <br /> 6• 6.0 REMARKS AND SIGNATURES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 <br /> L <br /> TABLES <br /> L <br /> Table 1 Analytical Methods, Sample Containers and Preservatives . . . . . . . . . . . . . 4 <br /> L <br /> FIGURES <br /> Figure 1 Regional Location Map <br /> Figure 2 Stockton West 7.5 Minute Quadrangle <br /> Figure 3 Port Road No. 8 Facility <br /> Figure 4 Diagram of Monitoring Well <br /> LAPPENDICES <br /> Appendix A Health and Safety Plan <br /> Appendix B Sampling Methodology <br /> Appendix C Quality Assurance <br /> L <br /> Sierra-Pacific Groundwater Consultants, Inc. i <br />
The URL can be used to link to this page
Your browser does not support the video tag.