Laserfiche WebLink
60 <br /> 60 TABLE OF CONTENTS <br /> 1.0 INTRODUCTION...............................................................................................................................1 <br /> ►. 2.0 PROJECT BACKGROUND..............................................................................................................1 <br /> L 3.0 MONITORING WELL INSTALLATIONS,DEVELOPMENT,AND SURVEYING................2 <br /> 3.1 FIELD PREPARATION.....................................................................................................................2 <br /> 3.2 DRILLING PROCEDURES...............................................................................................................3 <br /> L 3.3 FIELD OBSERVATIONS ..................................................................................................................3 <br /> 3.4 MONITORING WELL INSTALLATION PROCEDURES ..............................................................3 <br /> 3.5 WELL CASING SURVEY.................................................................................................................4 <br /> L 3.6 MONITORING WELL DEVELOPMENT.........................................................................................5 <br /> 4.0 MONITORING WELL MW-4 DESTRUCTION............................................................................6 <br /> L5.0 LIMITATIONS AND SIGNATURE.................................................................................................6 <br /> ►. TABLES <br /> TABLE 1 -MONITORING WELL CONSTRUCTION DETAILS.......................................................4 <br /> 6. TABLE 2 -MONITORING WELL SURVEY DETAILS (MAY 20,2010)...........................................4 <br /> TABLE 3 -DEPTH TO GROUNDWATER(APRIL 26 AND 27,2010)...............................................5 <br /> ATTACHMENTS <br /> L ATTACHMENT A <br /> Figure 1 Vicinity Map <br /> Figure 2 Site Map with Monitoring Well Locations <br /> V <br /> ATTACHMENT B <br /> "Approval on "Work Plan and Time Schedule for Analyses of Background Groundwater <br /> Quality,"ty,"City of Stockton, San Joaquin County"dated July 20,2009 <br /> "Destruction of Groundwater Monitoring Well MW-4, Stockton Regional Wastewater Control <br /> L Facility, San Joaquin County"dated August 17, 2009 <br /> San Joaquin County Environmental Health Department Monitoring Well Installation Permit, <br /> approval dated April 14, 2010 <br /> L <br /> ATTACHMENT C <br /> LGeologic Logs <br /> Well Survey Data <br /> L ATTACHMENT D <br /> Well Development Field Forms <br /> L l <br /> klk4 <br /> to 41 CONDOR <br />