Laserfiche WebLink
U <br /> J <br /> U LL0 <br /> Z � Er- <br /> o O <br /> c� <br /> Lu <br /> ZD <br /> — _(Z <br /> _J � U <br /> w � <br /> OwN <br /> Z '� c <br /> w � O <br /> V � <br /> [n <br /> w <br /> rY <br /> I 8 <br /> PLUMBING PLAN NOTES: s I FDPATHEWING I5 AN INSTRUMENT OF <br /> ND AS SUCH SHALL REMAIN <br /> THE 2 O GN <br /> CONNECT NEW 2" COLD WATER LINE TO EXISTING 2" COLD WATER 01 <br /> C�UNAUTFIORZEDUSE TY OF NEPTUNE IdF <br /> EXISTING 1.25 G -- ----- <br /> 2"CW(ETR 1 - LINE STUB-OUT PROVIDED BY LANDLORD. VERIFY EXACT SIZE AND 11 53 cnoluwlrHourPERMIss1oN <br /> LOCATION PRIOR TO INSTALLATION. PROVIDE NEW ACCESSIBLE MAIN 1 RCHITEC7ISPROHIBITTED. <br /> EXI TING RTU'S 1 FS AWING IS ONLY FOR USE IN <br /> WATER SHUT- OFF VALVE 12" ABOVE THE CEILING HEIGHT. f0NWITHTH15PR0lECTAND <br /> NOT BE USED FOR OTHER <br /> IONS.COPYRIGHT 2017. <br /> I 2"CW - O2 EXISTING GAS METER WITH EXISTING 3" GAS LINE ROUTED TO THE <br /> 11 C TENANT SPACE. CONTRACTOR TO VERIFY EXISTING GAS METER SHALL <br /> _ BE CAPABLE A TOTAL GAS DEMAND LOAD OF 1126 CFH, SIZED FOR 7" _-- <br /> i 3 - W.0 PRESSURE, PRESSURE DROP OF 0.5" WC WITH A SPECIFIC GRAVITY <br /> i 1 1"G 2.5"G OF 0.60 WITH A TOTAL DEVELOPED LENGTH OF 200 FEET, PROVIDE NEW �� FCO ° 3"VTR 2"V UP <br /> 2 CW - <br /> ACCESSIBLE MAW GAS SHUT-OFF VALVE 12" ABOVE THE CEILING _ _ _ <br /> I 3 4"HW -- � 1/2"CW 53 3"G TO EXISTING HEIGHT. � r - ----7'�-2'V � --2"V �15 2 V- - � -- - -2 - - - <br /> I 3"W DN <br /> GAS METER ' I 18 Wca 12 2 V UP I <br /> (50MBH) - 3 4" PVC BEVERAGE CONDUIT OVER HEAD FROM BAG-N-BOX TO I I I FS I 2"W DN W <br /> 3 O I 10 15 wco <br /> WHA WH I� c� 15 16 � BFP BEVERAGE STATION. CONFIRM FINAL CONNECTIONS WITH KITCHEN I _ I I s <br /> 12 ET N EQUIPMENT CONTRACTOR (KEC). I d <br /> 1 m <br /> 4 3 2 I =-- _ _ _ _ _-- -� - _-- TMV I ----- - - ------------------- O4 ROUTE 1/2" COLD WATER LINE TO NEW EVAPORATIVE COOLER ON ROOF. r_� i --$ - - - �- --- - - - --- 12 - - - - ---I -_ -- m <br /> �- 0 12 AP I uP <br /> I I I <br /> O REFER TO GAS RISER DIAGRAM ON SHEET P4.0 FOR CONTINUATION OF W w 4 5 DN--i j OZ <br /> ° TP —. <br /> u u � u u u GAS PIPING TO KITCHEN EQUIPMENT AND WATER HEATER. Q Q <br /> w U <br /> O6 INSTALL LEAD FREE DOUBLE CHECK BACKFLOW ASSEMBLY "BFP" AT 2"V UP I i I V <br /> 5 TP WATER LINE SERVING ICE MACHINE AND THE WATER FILTER. 3"GW DN I <br /> TC <br /> Q FD W INSTALL LEAD FREE DOUBLE GHEGK BACKFLOW ASSEMBLY "BFP" AT I !i_ _________ n________ cc W <br /> i.I 3WMA WATER LINE SERVING ICE TEA DISPENSER. - I G <br /> 5 23 5 I 2"V UP FD I wC <br /> 5 \ 227MBH 5 7 WC OS CONNECT NEW 4" GREASE WASTE LINE TO EXISTING 4" GREASE WASTE I 3"GW DN 3 Q <br /> 25 5 45 5 24 22 p3 LINE SIZE. VERIFY EXACT SIZE, LOCATION AND INVERT PRIOR TO 0 L2"V UP WCO I U <br /> 227MBH <br /> 11 OCFH 100MBH MBH __ INSTALLATION. EXISTING GREASE WASTE LINE ROUTED TO AN EXISTING 28 2"GW DN , <br /> - o 3,000 GREASE INTERCEPTOR FS I I -2"W 0 <br /> 29 I _ I --2"V UP CTI <br /> BFP TMV O CONNECT NEW 4" SANITARY WASTE LINE TO EXISTING 4" SANITARY I LV 2"W DN <br /> 28 �' WASTE LINE SIZE. VERIFY EXACT SIZE, LOCATION AND INVERT PRIOR TO <br /> -------- ;; I • LV INSTALLATION. --_____- �II <br /> I II ° TI T T-'�-T T F-1 <br /> �, f�l T T- TTI �� I <br /> - - - I I - - - - - - 10 ROUTE 1" CONDENSATE LINE FROM NEW ROOF TOP UNITS AND 1-1/2" i o I U-1 LI L U rl <br /> - ------- -- - -- - - -' ------- -- <br /> 3 --- o c ----- c U 1 LIQ - U r i ��\ WATER DRAIN LINE FROM MAKEUP AIR UNITS TO NEW MOP SINK. RUN - ` ---k <br /> v - - - ---- — - - - �� CONDENSATE AND WASTE LINE DOWN IN WALL AND DISCHARGE OVER - �,$ I 2'V -UP! -- _ I <br /> I -3"G <br /> C =---___= --_____-=�= -_-� MOP SINK WITH AIR GAP PER CODE - --------- - ----------- ----- IIf17 <br /> 1 — ------ --------W____---------------- ---- 1 <br /> T 1--- ----- ------ ------ W ASSEMBLY i ---- . , - - - y----- -----, `---- ------ ------- -- `'---- �--- <br /> I 2"GW DN 3"GW DN <br /> -+ ,---- ------f 1------ ------ ------------+ t---- -----,� ,4 ; , 11 INSTALL STAINLESS STEEL REDUCED PRESSURE BACKFLOW _f_ <br /> 13 z "DCV" AT WATER LINE SERVING BEVERAGE CARBONATOR. i 12 I FCO I d <br /> TMV <br /> 12 TP -0 FD 12 GAS FIRED WATER HEATER ON SHELF ABOVE MOP SINK. ROUTE 1" COLD i WCO FD <br /> APAND HOT WATER LINES FROM WATER HEATER TO PLUMBING FIXTURES <br /> AS INDICATED ON PLAN. <br /> 1 1 _ -- _ -_ - ----.o�.� --- -. --- <br /> w- <br /> ------- <br /> --- <br /> ® <br /> W- <br /> ---- - - <br /> --------- -- -------- <br /> ROUTE2'V UP <br /> __--CUNTERAND OVER TO DIPPER WELLSAND WELL WARMERPROVIDE- ----- --- <br /> II <br /> --------- <br /> DN <br /> ----------------------------------- --- - --------'� 1 <br /> COLD <br /> BACK <br /> N 3W DN IL------ <br /> 11L------- <br /> ___--IIL_______ BACKFLOW PREVENTER TO WATER LINE SERVING WELL WARMER. ®j_q a <br /> 1/2"CW --------- <br /> DN ! i <br /> r i � <br /> Kp <br /> 37 1 5 1 DT IP3 L�-- -- I p ¢ <br /> -- -2"W <br /> n 9 I 2"V UP <br /> -------- <br /> 2"W DN <br /> WHA i-------- c LV p <br /> i_ 1 L l L WC <br /> we I wca <br /> j FD <br /> a <br /> U FD i I • <br /> � � I <br /> I >, <br /> I i <br /> I 3 <br /> INN FCa 2"V UP <br /> I BFP I I 2"w DN 0 <br /> 6 <br /> --——— � 6 3 i �_____— <br /> 1 I i i I :I: T 1.25" 2"V UP <br /> I -.I-. t <br /> , a4 S DN <br /> I 1 I11 ;Q 0 <br /> L] u BFP `J FS <br /> ` , I <br /> 7 4 00 6Y uP;00 DATE: 10.17.2018 <br /> L------ 3 W <br /> ' REVISION <br /> I ; I <br /> I I <br /> IL-------- <br /> JfT <br /> n II <br /> II 11 <br /> Is , kl 3 <br /> II � II <br /> l <br /> P <br /> P� HE� �F <br /> C7 M <br /> 36618rn <br /> 9�F CHA N <br /> OF cp'0 <br /> PLUMBING FLOOR <br /> PLANS <br /> WATER } &, GAS PIPING PLAN 2 SAN��V0Y, & VENT PIPING PLAN2 <br /> 1/41 — 1 —0 1/4 <br />