My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2500
>
2900 - Site Mitigation Program
>
PR0524190
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 2:10:20 PM
Creation date
4/3/2020 1:50:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524190
PE
2965
FACILITY_ID
FA0016241
FACILITY_NAME
STOCKTON REGIONAL WATER CONTROL FAC
STREET_NUMBER
2500
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16333003
CURRENT_STATUS
01
SITE_LOCATION
2500 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
729
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD <br /> CENTRAL VALLEY REGION <br /> MONITORING AND REPORTING PROGRAM NO. R5-2003-0017 <br /> FOR <br /> VILLAGE WEST MARINA MAINTENCE DREDGING PROJECT <br /> SAN JOAQUIN COUNTY <br /> This monitoring program includes dredge site monitoring, effluent(return-water)monitoring <br /> and receiving water monitoring. <br /> DREDGE SITE RECEIVING WATER MONITORING <br /> Grab samples shall be taken from the following stations: <br /> Station Description <br /> R-1 located in an unaffected area outside of the manna, and not to exceed _ <br /> 3000 feet from the dredge. <br /> R-2 located inside the marina within 300 feet of the dredge suction head. <br /> The first set of samples shall be reported within 72 hours, monitoring may be adjusted - <br /> according to results. Samples shall be collected and analyzed from Stations R-1 and R-2 as <br /> follows: <br /> Constituent/analysis Units Sampling Frequency <br /> Turbidity NTUs Daily <br /> Dissolved Oxygen mg/1 Daily <br /> Arsenic µg/1 (filtered) Every Fifth Day <br /> DMD SITE EFFLUENT MONITORING <br /> The effluent from the sedimentation basin or Dredged Material Disposal (DMD) site shall be <br /> monitored at the overflow weir or discharge pipe during discharge. The initial set of samples <br /> shall be collected within 24 hours and reported within 72 hours from initiation of discharge. <br /> Subsequent samples shall be collected from the effluent discharge and analyzed according to <br /> the following schedule: <br /> Constituent/analysis Units Sampling Frequency <br /> Flow MGD Daily <br /> pH Daily <br /> Suspended solids mg/I Every Third Day <br />
The URL can be used to link to this page
Your browser does not support the video tag.