My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2500
>
2900 - Site Mitigation Program
>
PR0524190
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 2:10:20 PM
Creation date
4/3/2020 1:50:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524190
PE
2965
FACILITY_ID
FA0016241
FACILITY_NAME
STOCKTON REGIONAL WATER CONTROL FAC
STREET_NUMBER
2500
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16333003
CURRENT_STATUS
01
SITE_LOCATION
2500 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
729
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MONITORING AND REPa7CTING PROGRAM NO.R5-2003-0017 v 3 <br /> VILLAGE WEST MARINA MAINTENANCE DREDGING <br /> The following are the "normal' expected turnaround times for laboratory analysis: <br /> Total Suspended Solids 3 days after sample collection <br /> Acute bioassays 7 days after sample collection <br /> Chronic bioassays 21 days after sample collection s ;4} <br /> Other analyses 14 days after sample collection <br /> Sample holding times must be observed according to U.S. EPA recommendations. Regional <br /> Board staff may ask for shorter turnaround times in cases where there is potential for the . <br /> effluent to exceed water quality objectives in the receiving water and to impair beneficial uses <br /> (i.e. Arsenic and Tributyltin). <br /> The Discharger shall immediately notify the Board by telephone whenever a violation or <br /> adverse condition occurs as a result of the dredging and disposal operation or the discharge of <br /> effluent. Written confirmation shall follow within 2 weeks. <br /> If the project is in operation for more than one month, monthly Self Monitoring Reports shall <br /> be submitted to Regional Board Staff no more than 15 days after the end of the month. The <br /> Self Monitoring Reports shall include: <br /> 1. The date, exact place, time of sampling and the name of the person taking the <br /> sample. S. <br /> 2. The dates analyses were performed and the name of the person who performed the <br /> analyses. <br /> 3. Analytical techniques/methods used. <br /> 4. Results of the analyses. <br /> The Discharger shall compile and summarize the data from the Self Monitoring Reports and <br /> submit an Annual Report to Board staff within 30 days of project completion. <br /> The Discharger shall implement the above monitoring program on the effective date of this <br /> Program. � Q p <br /> Ordered by. I �� 1` 1 <br /> THOMAS R. PINKOS, Executive Officer <br /> 31 January 2003 <br /> (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.