Laserfiche WebLink
[o <br /> Reno <br /> Airport <br /> P <br /> P <br /> Enlarged Area " <br /> 0 <br /> California Environmental <br /> 9 Protection Agency <br /> 'TJ erican Air Resources Board <br /> i <br /> -P� Department of Toxic <br /> �e r Substances Control <br /> State Water Resources <br /> Control Board <br /> to <br /> 50 <br /> San Francisco _ Integrated Waste <br /> Management Board <br /> Department of <br /> to Pesticide Regulation <br /> 50 Lake Tahoe Office of Environmental <br /> to Health Hazard Assessment <br /> S to <br /> Stockton <br /> Lot I(7th&G St.) <br /> $0.75 ea 12 hr. <br /> �v <br /> it Lot 2(7th&GSL) <br /> hs � $0.75 ea 12 hr. <br /> 5 <br /> h $0. A(7th& r.for fp <br /> $0.75 ea 12 hr.for first 2 his. <br /> $1.50 es additional hr. <br /> $8.00 maximum charge <br /> P[ � �y 5� Lot C(14th&R SL) <br /> $5.00 flat rate <br /> W CSG Lot G(3rd&L) <br /> A a R $0.75 ea. 12 hr.for fust 2 his. <br /> •1 f $1.1.5 ea additional L2 hr. <br /> Oy $13.00 daily maximum charge <br /> h <br /> Lot R(10th&L) <br /> 5 c`S $1.25 each 12 hr. <br /> $15.00 daily maximum charge <br /> 0 R Lot I(10th&1,11th&I) <br /> © Sr 0 $1.00 each 12 hr. <br /> © $12.00 daily maximum charge <br /> X ?. 0 Lot K(6th&J/L,7th&K) <br /> ANT $0.75 ea 12 hr.for first 2 his. <br /> C 19. © ns $1.25 ea additional 12 hr. <br /> / D1 .` 1i9h7 ail.....R $13.00 daily maximum charge <br /> V sG <br /> Q 00NTZ Lot P(2nd&I) <br /> / © C'�RON $1.00 each additional 12 hr. <br /> $12.00 daily maximum charge <br /> Lot U(511h&J) <br /> $0.50 ea.1/2 hr.for first 2 his. <br /> y $1.00 ea.additional 12 hr. <br /> $12.00 maximum charge <br /> ':O SY CI Lot W(2nd&I St.) <br /> $5.00 Oat rate <br />