Laserfiche WebLink
• • EDMUND O.BROWN JP. <br /> } OOVEnXOP <br /> AT'HM <br /> RIQUEZ <br /> pALIFp11M1• <br /> FRErlLxva oL Exn orRmecuoN <br /> Water Boards <br /> Central Valley Regional Water Quality Control Board <br /> 14 July 2016 <br /> Nichole Gleason <br /> Robinhood Plaza Shopping Center, LLC <br /> 621 Capitol Mall, Floor 18 <br /> Sacramento, CA 95614 <br /> WORK PLAN FOR SUB-SLAB VENTING AND SVE WELL ABANDONMENT, C&S ONE HOUR <br /> MARTINIZING FACILITY AT ROBINHOOD PLAZA, SAN JOAQUIN COUNTY <br /> Central Valley Water Board staff has reviewed the 13 July 2016 Work Plan to Install a Sub-Slab Venting <br /> System and Abandon Soil Vapor Extraction Wells (Work Plan) for the C&S One Hour Martinizing Facility <br /> submitted by Terraphase Engineering Inc. on behalf of Robinhood Plaza Shopping Center, LLC. The <br /> Work Plan was submitted pursuant to our discussions with you during a 24 February 2016 meeting. <br /> Central Valley Water Board staff also reviewed a draft version of the Work Plan and it was modified in <br /> this final version to include venting between the wall and the dry cleaning machine following further <br /> discussions during a 6 July 2016 meeting and an 11 July 2016 site visit. <br /> The Work Plan proposes to install a passive sub-slab venting system and to abandon three of the four <br /> soil vapor extraction (SVE) wells (EX-2 through EX-4) and the five soil vapor probes (SVP-1 through <br /> SVP-5). The SVE wells will be abandoned by in accordance with permits from San Joaquin County <br /> Environmental Health, and the soil vapor probes will be abandoned by sealing with grout to flush grade. <br /> As shown in Figures 3 through 5 of the Work Plan, the sub-slab venting will consist of 1-inch diameter <br /> schedule 80 PVC pipes that include a slotted section next to the dry cleaning machine and that connects <br /> to 1-inch diameter slotted stainless steel piping along the wall. A separate 1-inch pipe will be connected <br /> to EX-1. Both pipes will run underneath the slab to the exterior of the building, then underneath the side <br /> walk and up the side of the building to a passive turbine vent. The pipes that run up the side of the <br /> building will be covered with a rain gutter downspout or similar covering that will be painted to match the <br /> building. Trenching for the piping will be performed by saw cutting through the concrete slab and digging <br /> to approximately 7 inches below the slab. The slotted steel pipe next to the wall will be installed by <br /> driving the pipe directly into the sub-slab gravel. After the piping is installed and backfilled, a heavy <br /> plastic liner or geotextile fabric will be placed above the bedding material and concrete will be poured <br /> and finished to match existing grade. Excavated soil will be stored on-site in a secure location in <br /> 55-gallon drums for characterization and proper disposal at a landfill. <br /> Central Valley Water Board staff concurs with the work proposed in the Work Plan. As proposed, a <br /> report must be submitted documenting completion of the work at which time a request for No Further <br /> Action can be made. The No Further Action request must include a trend analysis similar to the <br /> 15 March 2016 draft Trend Analysis technical memorandum , and include discussion of previous <br /> remedial efforts, protection of human health, and water quality data from previous investigations at the <br /> KARL E. LONOLEY SCD, P.E.,CHAIR I PAMELA C. CREEOON, EXECUTIVE OFFICER <br /> 11020 Sun Center Drive#200,Rancho Cordova.CA 95670 I www.waterboards.ca.gov/centralvalley <br /> L',PCYCLED 1I a <br />