Laserfiche WebLink
• • Page 2 of 5 <br /> Hi Mike-attached is the new sketch. The MFR is in process— I expect to send it to you tomorrow <br /> (July 7). Max <br /> From: Mike Infurna [EH] [mailto:MInfurna@sjcehd.com] <br /> Sent: Monday, July 06, 2009 3:10 PM <br /> To: MacLeod, Max <br /> Subject: RE: Four proposed soil vapor wells, 10'- 10.5 deep at Robinhood plaza <br /> good... <br /> my accounting dept was asking about this permit...w/o the C-57 info, I was <br /> stopped. <br /> #1 . figured as much since Brenda sent in the LCD already... <br /> #2. get me a new schematic for the wells that shows the changes.. <br /> #3. you made the $105/hour dead line...no additional fees due at this <br /> time....but I need an MFR since you're changing the billing party. <br /> Attached is a blank (PDF)...complete and sign it and PDF it back to me. <br /> And Max, don't try that typing insert thing on the MFR that you tried on the <br /> permit. tough to read/follow. Good ole fashion printing will be just find. <br /> I'll issue the permit today or tomorrow assuming you get me the MFR <br /> today. I'll advise you... MFR must be on file before I process. <br /> From: MacLeod, Max [ma ilto:Max.MacLeod@lfr.com] <br /> Sent: Monday, July 06, 2009 11:33 AM <br /> To: Mike Infurna [EH] <br /> Subject: RE: Four proposed soil vapor wells, 10'- 10.5 deep at Robinhood plaza <br /> Thanks for the reply Mike- <br /> #1 -Yes, you are correct, I meant to fill in information for Precision Sampling <br /> 2365 Wigwam Dr. <br /> Stockton, CA 95205 <br /> (209)465-8712 <br /> (209)465-8773 fax <br /> #2-Yes-we like the option of using only Bentonite only for our casing seal, and the concrete <br /> will only be to set the well box. <br /> #3—We'd like to put ourselves on the hook for billing of services provided by the SJCEHD. <br /> Let's use the following contact: <br /> Scott Seyfried, Principal Geologist <br /> C/O LFR, Inc. <br /> 1410 Rocky Ridge Drive <br /> Suite 330 <br /> Roseville, California 95661-2822 <br /> Main: (916)786-0320 <br /> One other item: I sent a check to the SJCEHD for$404.- (1 thought the hourly rate was$105 <br /> -so the check was first 3 hours of inspector's time (3 X $105) + ($89.-for boring permit) _ <br /> $404.-). 1 now believe I owe you an additional $60.-(because the actual rate is $125.-not <br /> $105.-). Is this correct? I will begin processing the as soon as you confirm that we owe an <br /> additional $60.-. <br /> 7/8/2009 <br />