My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5756
>
2900 - Site Mitigation Program
>
PR0527591
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 2:11:39 PM
Creation date
4/3/2020 2:05:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0527591
PE
2960
FACILITY_ID
FA0018695
FACILITY_NAME
ROBINHOOD PLAZA/C & S CLEANERS
STREET_NUMBER
5756
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227010
CURRENT_STATUS
01
SITE_LOCATION
5756 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/03/2008 09: 39 9167860366 <br /> /{(U V11a1Vou .rld/d OuUJJP�ALB �•��,•••,�� a uuaw LFR _-. PAGE 03/03 <br /> 22 <br /> Freeman, Lita <br /> From: Mike Infurna [EHj [Mlnfurna@sjcehd.com] <br /> Sent: Wednesday, September 03, 2008 8:29 AM <br /> To: Freeman, Lila <br /> Subject: RE: Robinhood Plaza Shopping Center- 5756 Pacific Avenue, Stockton, CA ���JRSEP 4 2 0 <br /> p� 0 8 0 <br /> thank you. PFRMJN&/v Eq�Ty <br /> gw grabs only mentioned abandonment of the hydropunches by SJCEHD policy. J�FS <br /> how many you proposing? 3 locations = 3 borings? <br /> neat cement to surface is the way. room at the surface can be left for material to <br /> match surrounding. (asphalt, black concrete, landscaping, etc). I'll need to be <br /> onsite for the first grout. <br /> submitting on Tuesday is really pushing it. like I said before, go for it. I can't <br /> promise I'll get to it. <br /> rushing goes both ways. rush to start means RUSH to get the report out and pay <br /> bills sent by EHD on time, It's a two way street. Three months for report to get to <br /> me from last phase is NOT rushing (last day of drill 4-9-08 and report here July 14). <br /> Billing last time went to SECOND notice, as in past due. <br /> based on rush and overdue pay me tjr t=lf-r,quif r repayment also to <br /> credit this account. At $105/hoLK_r 15 in a separate check I addition to the <br /> $89 check for the permit. If I can't get to it during normal business hours to meet <br /> your rush/Thursday drill, I will have to spend over-time hours to process at 1.5 rate. <br /> I'll need your authorization to spend over-time to meet your schedule if needed. <br /> an email will suffice. <br /> From: Freeman, Llta [mailto:Llta.Freeman@Ifr.com] <br /> Sent: Tuesday, September 02, 2008 4:48 PM <br /> To: Mike Infurna [EH] <br /> Subject: RE: Robinhood Plaza Shopping Center - 5756 Pacific Avenue, Stockton, CA <br /> Mike <br /> Sorry about the proposed time line - I just left you a voice mall -please feel free to give me a call to <br /> discuss we are trying to meet client's time table but I know that there are certain requirements to be met <br /> so that you can issue the permit. <br /> I should start with a recap of what has happened at the site. We did initial sampling at the C&S One-Hour <br /> Martinizing facility in the shopping center in November 2007 then installed soil gas wells In April 2008 to <br /> further evaluate the PCE extent. The report presenting the results of the sampling and our <br /> recommendations for additional work is dated June 18, 2008 (see attached) and was submitted to the <br /> RWQCB, the lead agency, that day. The RWQCB is just giving us comments from their review. Our case <br /> worker at the RWQCB is Roberto Cervantes and his phone number is 916.464.4682, Duncan Austin is his <br /> supervisor. <br /> We plan to use Vironex's limited access direct push rig to collect samples at three locations on the <br /> 9/3/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.