My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
5756
>
2900 - Site Mitigation Program
>
PR0527591
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 2:08:43 PM
Creation date
4/3/2020 2:06:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0527591
PE
2960
FACILITY_ID
FA0018695
FACILITY_NAME
ROBINHOOD PLAZA/C & S CLEANERS
STREET_NUMBER
5756
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
10227010
CURRENT_STATUS
01
SITE_LOCATION
5756 PACIFIC AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LFR . 0 ARCADIS company <br /> Monitoring frequency is presented in Table 1. Descriptions of each type of measurement are <br /> presented below. <br /> Table 1: Summary of Monitoring Parameters and Frequency <br /> Flow Rate and Organic Vapor Concentration <br /> Parameter Vacuum Temperature g P <br /> Magnehelic Pitot Tube or PID Laboratory Sample <br /> InstrumentationO-14) <br /> Gauge Anemometer IT <br /> Step Test <br /> SVE Well Every 5 minutes Every 5 minutes Before start andBefore star[of test <br /> every 30 minutes <br /> Monitoring Every 30 minutes NA Before start of test Before start of test <br /> Wells <br /> Carbon Effluent NA NA Every 30 minutes NA <br /> Constant Rate Test <br /> Every hour during Every hour during day Every hour during <br /> SVE Well day I and every 2 1 and every 2 days day 1 and every 2 At end of test <br /> days thereafter thereafter days thereafter <br /> Monitoring Every hour during Every hour during day Every hour during <br /> Wells day 1 and every 2 1 and every 2 days day 1 and every 2 At end of test <br /> days thereafter thereafter days thereafter <br /> Every hour during <br /> Carbon Effluent NA NA day 1 and every 2 NA <br /> days thereafter <br /> Notes: <br /> NA = test not applicable <br /> PID and laboratory samples will be collected in and analyzed in 1-liter Tedlar bags. <br /> Vacuum Pressure Monitoring <br /> The nearby soil-vapor monitoring wells will be instrumented with vacuum gauges to measure <br /> pressure changes in the unsaturated-zone soils. A range of gauges with different scales will be <br /> available during the tests to allow measurement of a range of vacuum in the soil vapor. The <br /> extraction well vacuum will be monitored with a gauge connected to a manifold installed on the <br /> blower. <br /> wp-CS-SVE-May09-09366.dmdeh 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.