My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_PHASE II ENVIRONMENTAL SITE ASSESSMENT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2711
>
2900 - Site Mitigation Program
>
PR0527620
>
ARCHIVED REPORTS_PHASE II ENVIRONMENTAL SITE ASSESSMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 2:20:39 PM
Creation date
4/3/2020 2:08:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
PHASE II ENVIRONMENTAL SITE ASSESSMENT
RECORD_ID
PR0527620
PE
2959
FACILITY_ID
FA0018715
FACILITY_NAME
LEARNER COMPANY, THE
STREET_NUMBER
2711
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2711 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WGR <br /> Southwest, Inc. <br /> • TABLE OF CONTENTS <br /> LIMITATIONS,WARRANTIES AND CERTIFICATION..................................................IV <br /> 1.0 INTRODUCTION....................................................................................................................1 <br /> 2.0 PURPOSE OF INVESTIGATION.........................................................................................1 <br /> 3.0 SCOPE AND LIMITS OF INVESTIGATION.....................................................................1 <br /> 4.0 SITE DESCRIPTION..............................................................................................................2 <br /> 4.1 SITE SETTING...........................................................................................................................2 <br /> 4.2 SITE FEATURES........................................................................................................................3 <br /> 5.0 SITE HISTORY.......................................................................................................................4 <br /> 5.1 CURRENT USAGE.....................................................................................................................4 <br /> 5.2 HISTORICAL USAGE.................................................................................................................4 <br /> 5.3 PREVIOUS INVESTIGATIONS......................................................................................................5 <br /> 5.4 PHASE I ENVIRONMENTAL SITE ASSESSMENT..........................................................................7 <br /> 5.4.1 HEA vYMETALS......................................................................................................................7 <br /> 5.4.2 STORM WATER MANAGEMENT PRACT/CES...............................................................................7 <br /> 5.4.3 LEAKAGE FROM LISTS AND ASTS............................................................................................8 <br /> 5.4.4 PCB CONTAMINATION AND CONCERNS...................................................................................8 <br /> 5.4.5 SURFACE STAINING AND DOCUMENTED PETROLEUM RELEASES...............................................9 <br /> 5.4.6 EQUIPMENT WASH AREA AND DISPOSAL OF WASH WATER.....................................................10 <br /> 5.4.7 RAD/OACTIVITY....................................................................................................................11 <br /> 5,4.8 IMPROPER STORAGE.............................................................................................................11 <br /> 5.4.9 DOCUMENTED IMPROPER HANDLING OF HAZARDOUS MATERIALS AND PETROLEUM <br /> HYDROCARBONS...........................................................................................................................11 <br /> 5.4.10 BATTERIES AND QUALITY CONTROL ISSUES.........................................................................12 <br /> 5.4.11 AUTOMOBILE DEBRIS ON SOUTH DITCH BANKS...................................................................12 <br /> 5.4.12 VEHICLE AND TIRE STORAGE..............................................................................................13 <br /> 5.4.13 ADJACENT PETROLEUM TERMINAL.....................................................................................13 <br /> 6.0 GEOLOGY AND HYDROGEOLOGY...............................................................................14 <br /> 6.1 PHYSICAL SETTING................................................................................................................14 <br /> 6.2 GEOLOGIC CONDITIONS .........................................................................................................14 <br /> 6.3 GROUNDWATER CONDITIONS.................................................................................................15 <br /> 7.0 PRE-FIELD ACTIVITIES ...................................................................................................15 <br /> 7.1 PERMITTING...........................................................................................................................15 <br /> 7.2 HEALTH AND SAFETY PLAN...................................................................................................16 <br /> • 7.3 DRILL SITE CLEARANCE AND SITING OF BORINGS .................................................................16 <br /> 704. PR1.05 i July 21, 2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.