My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_TEMPORARY SOIL GAS PROBE PERMIT APPLICATION PACKAGE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
2711
>
2900 - Site Mitigation Program
>
PR0527620
>
ARCHIVED REPORTS_TEMPORARY SOIL GAS PROBE PERMIT APPLICATION PACKAGE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 2:12:48 PM
Creation date
4/3/2020 2:10:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
TEMPORARY SOIL GAS PROBE PERMIT APPLICATION PACKAGE
RECORD_ID
PR0527620
PE
2959
FACILITY_ID
FA0018715
FACILITY_NAME
LEARNER COMPANY, THE
STREET_NUMBER
2711
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95203
APN
14503009
CURRENT_STATUS
01
SITE_LOCATION
2711 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Soil gas samples will be collected as a part of the confirmation sampling activities at the Site; <br /> therefore, only temporary soil gas probes will be utilized. As mentioned previously, temporary soil <br /> gas probes will be installed in the vicinity of the potential source areas identified in the <br /> supplemental site assessment conducted by Miller Brooks. A direct-push sampling string will be <br /> ' hydraulically advanced to the target sampling depth by a truck-mounted drill rig. The sampling <br /> string will be retracted to expose a perforated sampling tip that is connected to the surface with <br /> inert tubing. The variation from TEG's SOP is that after the purge test has been completed, <br /> ' samples will be collected from each location using a summa canister provided by H&P. The <br /> samples will be delivered, using a laboratory provided courier, to the H&P off-Site laboratory for <br /> analysis at the end of each work day. <br /> Each soil gas sample will be analyzed for VOCs using USEPA Method TO-15. H&P has done the <br /> ' necessary tests to demonstrate and be approved by the DTSC to report naphthalene (at a <br /> lower detection limit) using TO-15. Therefore, the use of an off-Site mobile lab is necessary in <br /> order to meet the lower detection limits. In the event where anomalous data are obtained, re- <br /> sampling will be conducted. <br /> Upon completion of sample collection, the temporary soil gas probes properly decommissioned. <br /> ' The probes will be removed at the end of each day with each sample location subsequently <br /> backfilled in using hydrated granular bentonite. <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> ' 8 M, LMV+ ROOKS <br /> +�/B C <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.