Laserfiche WebLink
3 t <br /> 6. Overfill Protect ion .System (spill catchment basin(s) required) <br /> A. Nonmotor vehicle fuels (See Option 1A) <br /> 1 . Level sensing device and #2 or #3 below <br /> 2. Audible/visual alarm triggered to liquid level sensor <br /> 3. Automatic shut-off device <br /> B. Motor vehicle fuels only <br /> 1 ,, Manual monitoring <br /> a. Written filling procedure provided <br /> b. Procedure addresses all of the following: <br /> 1 ) Visual monitoring of fuel level and filling operation <br /> 2) Available caacity of tank is at 103% or +200 gallons <br /> (2635- 9) (AM)(C)) <br /> 3) Metered input <br /> C. Spill catchment basin size <br /> 1 . Minimum 5 gallons <br /> 10. Secondary containers (includes leak interception and detection systems). <br /> A. Backfill in secondary container -C Article ,3, Section 2635) <br /> 1 . See Article. 3 .Section. 2635(c) (1-8). <br /> B. Two or more primary containers within- secondary container (Demonstrate <br /> product compatibilities). <br /> C. Liquids detected ;Insecondary containment must be 'sampled and analyzed for <br /> hazardous substances. (Article 3, Section 2635(6) and Health and Safety <br /> Code 25291 (e)(h). <br /> D. Water tight cover for secondary container excavation (Article 3, Section <br /> 2635(7)) . <br /> 11.. Piping <br /> A. Double containment required for: <br /> 1 . Product and vapor recovery lines. <br /> 2. Vent. line (excluded only if ball float valve is installed). <br /> i <br /> i <br /> i <br /> I <br />