My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE_FILE 2
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2900 - Site Mitigation Program
>
PR0528433
>
SITE INFORMATION AND CORRESPONDENCE_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2020 2:42:53 PM
Creation date
4/3/2020 2:32:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
FILE 2
RECORD_ID
PR0528433
PE
2957
FACILITY_ID
FA0019174
FACILITY_NAME
CHEVRON SERVICE STATION 9-6171
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741048
CURRENT_STATUS
02
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
172
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Infurna [EH] <br /> From: Eli Scott [eli_scott@hfa.com] <br /> Sent: Tuesday, August 18, 2009 2:07 PM <br /> To: Mike Infurna [EH] <br /> Subject: Re: Chevron Site 96171 Well Permits (SJC LOP Case# 1784) <br /> In that case, maybe plan around 8. We'll be meeting on site at 7 AM. <br /> I/my field lead will need to give you a quick health and safety meeting and have you <br /> sign in on our health and safety plan, but you won't need to be there for the whole <br /> meeting. I figure we should be set up on our first location and ready for your approval <br /> to start by 8. <br /> Thanks, <br /> Eli <br /> On Aug 18, 2009, at 2:03 PM, Mike Infurna [EH] wrote: <br /> > You tell me when. <br /> > I'm not sure of your procedural plans, but I must verify that each <br /> > well scheduled for pressure grout is open to full depth of <br /> > construction with no obstructions before grout can be <br /> > injected/pressurized. NO grout goes in the casing w/o my ok. <br /> > And I need be there as each auger turns on the over bores. No auger <br /> > turns on a casing until I say ok. <br /> > You can do your site safety am meeting w/o me. Based on how long that <br /> > is, I can be onsite just as the meeting ends and the crew begins the <br /> > well destructions. <br /> > You tell me. <br /> > -----Original Message----- <br /> • From: Eli Scott [mailto:eli_scott@hfa.com] <br /> > Sent: Tuesday, August 18, 2009 1 :56 PM <br /> > To: Mike Infurna [EH] <br /> > Subject: Re: Chevron Site 96171 Well Permits (SJC LOP Case# 1784) <br /> > Mike, <br /> > If I remember correctly from clearance last week, MW-9 is a 2-inch <br /> > casing. However, cascade will have both 8 and 10 inch auger at their <br /> > disposal. I've also attached a plot plan that shows the wells that <br /> > are covered by this scope of work and if they will be over drilled, <br /> > pressure grouted, or transferred. Around what time do you think <br />
The URL can be used to link to this page
Your browser does not support the video tag.