Laserfiche WebLink
STANDARD OPERATING PROCEDURE <br /> QUARTERLY GROUNDWATER SAMPLING <br /> Gettler-Ryan field personnel adhere to the following procedures for the collection and handling of <br /> groundwater samples prior to analysis by the analytical laboratory Prior to sample collection, the type of analysis <br /> to be performed is determined Loss pevention of volatile compounds is controlled and sample preservation for <br /> subsequent analysis is maintained <br /> Prior to sampling, the presence or absence of free-phase hydrocarbons is determined using a MMC flea-dip <br /> interface probe. Product thickness, if present, is measured to the nearest 0 01 foot and is noted in the field notes <br /> In addition, static water level measurements are collected with the interface probe and are also recorded in the field <br /> notes <br /> After water levels are collected and prior to sampling, each well is purged a minimum of three well casmg <br /> volumes of water using pre-cleaned pumps(stack, suction, Grundfos), or polyvinyl chloride bailers. Temperature, <br /> pH and electrical conductivity are measured a minimum of three times during purging Purging continues until these <br /> parameters stabilize <br /> Groundwater samples are collected using Chevron-designated disposable bailers. The water samples aro <br /> transferred from the bailer into appropriate containers Pre-preserved containers, supplied by analytic laboratories, <br /> . are used when possible When pre preserved containers are not available, the laboratory is instructed to preserve <br /> the sample as appropriate Duplicate samples are collected for the laboratory to use in maintaining quality <br /> assurance/quality control standards The samples are labeled to include the,lob number, sample identification, <br /> collection date and time, analysis, preservative(if any), and the sample collector's initials The water samples are <br /> placed in cooler maintained at 4 C for transport to the laboratory Once collected in the field, all samples are <br /> maintained under chain of custody until delivery to the laboratory <br /> i <br /> The chain of custody document includes the job number, type of preservation, if any, analysis requested, <br /> sample identification, date and time collected and the sample collector's name The chain of custody is signed and <br /> dated (including tune of transfer) by each person who receives or surrenders the samples, beginning with the field <br /> personnel and ending with the laboratory personnel <br /> A laboratory-supplied trip blank accompanies each sampling set. For sampling sets greater than 20 <br /> samples, 5% trip blanks are included The trip blank is analyzed for some or all of the same compounds as the <br /> groundwater samples. <br /> As requested by Chevron USA Products Company, the purge and decontamination water generated during <br /> sampling activities is taken to C'hevron's Richmond Refinery for disposal <br />