My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006317
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2900 - Site Mitigation Program
>
PR0528433
>
ARCHIVED REPORTS_XR0006317
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:02:33 PM
Creation date
4/3/2020 4:16:59 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006317
RECORD_ID
PR0528433
PE
2957
FACILITY_ID
FA0019174
FACILITY_NAME
CHEVRON SERVICE STATION 9-6171
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741048
CURRENT_STATUS
02
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 — <br /> O <br /> SIERRA <br /> Clint Rogers Page 7 <br /> October 30, 1991 <br /> SES Project #1-146-01 <br /> Task 6 - Surveying and Ground Water Gradient <br /> The top of casing elevations of the new well will be surveyed by a licensed land surveyor <br /> The casing elevation will be surveyed relative to mean sea level using a USGS benchmark <br /> Water and product (if present) levels will be measured in all wells associated with the site <br /> using an MMC flexi-dip interface probe Water and product levels will be reported to the nearest <br /> 1/100th of a foot A ground water contour map will be prepared using survey and water level <br /> data <br /> Task 7 - Drill Cuttings Disposal and Monitoring Well Purge Water <br /> Disposal of the soil cuttings will be based on the analytic results The monitoring well <br /> development and purge water will be taken to a Chevron-designated disposal facility <br /> Task 8 - Report <br /> A report presenting the results of the investigation will be prepared The report will <br /> include <br /> Text <br /> - Summary of the results <br /> - Site background and history <br /> - Topographic and geologic setting <br /> - Description of soil sampling and subsurface sediments <br /> - Monitoring well installation <br /> - Depth to ground water and ground water flow direction and gradient <br /> - Conclusions <br /> Tables <br /> - Tabulated soil and ground water analytic results <br /> - Ground water elevation data and well construction details <br />
The URL can be used to link to this page
Your browser does not support the video tag.