My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006324
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2900 - Site Mitigation Program
>
PR0528433
>
ARCHIVED REPORTS_XR0006324
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:06:58 PM
Creation date
4/3/2020 4:24:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006324
RECORD_ID
PR0528433
PE
2957
FACILITY_ID
FA0019174
FACILITY_NAME
CHEVRON SERVICE STATION 9-6171
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741048
CURRENT_STATUS
02
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� 6ETTLER - RYAN <br /> INC, <br /> September 18, 1996 Job #5121 80 <br /> Mr Brett Hunter <br /> Chevron USA Products Company <br /> P O Box 5004 <br /> San Ramon, CA 94583 <br /> Re Third Quarter Groundwater Monitoring & Sampling Report <br /> Chevron Service Station #9-6171 <br /> 6633 Pacific Avenue <br /> Stockton, Califorma <br /> Dear Mr Hunter <br /> This report documents the quarterly groundwater sampling event performed by Gettler-Ryan Inc (G-R) On August 12, <br /> 1996, field personnel were on-site to monitor and sample six wells (MW-2 through MW-7) at Chevron Service Station <br /> 119-6171 located at 6633 Pacific Avenue, in Stockton, California <br /> Static groundwater levels were measured on August 12, 1996 All wells were checked for the presence of separate-phase <br /> hydrocarbons Separate-phase hydrocarbons were not present in any of the site wells Static water level data and <br /> groundwater elevations are presented in Table 1 A potentiometnc map is included as Figure 1 <br /> Groundwater samples were collected from the monitoring wells as specified by G-R Standard Operating Procedure - <br /> Groundwater Sampling(attached) The field data sheets for this event are also attached The samples were analyzed by <br /> Sequoia Analytical Analytical results are presented in Tables 1, 2, 3, and 4 The chain of custody document and <br /> laboratory analytical reports are enclosed <br /> ThanVyou for allowing Gettler-Ryan to provide environmental services to Chevron Please call if you have any questions <br /> or comments regarding this report <br /> Wcerely,cerely, <br /> tlY1Q� � <br /> r <br /> Deanna L Harding <br /> P ject Coord ator <br /> Penny L Sllzer a <br /> �U <br /> V�e�i <br /> SlIzer <br /> Sent G ologist, R G No 5523 No 5523 �2 <br /> DLH/PLS/dlh Tfi OF CA�\�O <br /> 5121 QML <br /> Figure I Potentiometric Map <br /> Table 1 Water Level Data and Groundwater Analytical Results <br /> Table 2 Field Measurements & Analytical Results <br /> Table 3 Analytical Results - Volatile Organic Compounds <br /> Table 4 Analytical Results - Bacteriological Elements <br /> Attachments Standard Operating Procedure - Groundwater Sampling <br /> Field Data Sheets <br /> Chain of Custody Document and Laboratory Analytical Reports <br /> 6747 Sierra Court , Suite J Dublin , California 94568 ( 510 ) 551 - 7555 <br />
The URL can be used to link to this page
Your browser does not support the video tag.