My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006363
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2900 - Site Mitigation Program
>
PR0528433
>
ARCHIVED REPORTS_XR0006363
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:13:45 PM
Creation date
4/3/2020 4:39:44 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006363
RECORD_ID
PR0528433
PE
2957
FACILITY_ID
FA0019174
FACILITY_NAME
CHEVRON SERVICE STATION 9-6171
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741048
CURRENT_STATUS
02
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT A <br /> FIELD AND LABORATORY PROCEDURES <br /> Soil Sampling <br /> Soil samples were collected by advancing 2-inch-diameter brass sample liners into <br /> in-situ soil or into soil removed from an excavation by a backhoe bucket Soil samples <br /> for chemical analysis were retained in the brass liners, labeled, and capped with Teflon <br /> sheets and plastic end caps The samples were then sealed in clean clear zip-lock bags, <br /> placed on ice, and transported to the laboratory accompanied by the appropriate chain- <br /> of-custody documentation <br /> Conductor Casing Installation <br /> Wendt Construction installed 4 inch diameter SDR-26 piping (similar to Schedule 40 <br /> PVC) at P-5, P-7, P-16, and waste oil tank 1 locations The length of the conductor <br /> casing varies from product line to waste oil tank pit 1 locations Conductor casing <br /> installed at the product line locations was approximately 3 to 5 feet bgs Conductor <br /> casing installed at waste oil tank l was approximately 17 feet bgs At the surface all <br /> four conductor casings are covered with groundwater monitoring well type boxes <br /> Soil Sampling for Stockpiled Soil <br /> Soil samples were collected by advancing 2-inch diameter brass sample liners <br /> approximately one to two feet into the soil stockpile Several composite samples were <br /> collected Soil samples for chemical analysis were retained in the brass liners, labeled, <br /> and capped with Teflon sheets and plastic end caps The samples were then sealed in <br /> clean clear zip-lock bags, placed on ice, and transported to the laboratory accompanied <br /> by the appropriate chain-of-custody documentation <br /> Laboratory Analysis of Soil Samples <br /> Analyses for total petroleum hydrocarbons calculated as gasoline and diesel, benzene, <br /> toluene, ethyl benzene, and xylenes, and methyl tertiary butyl ether, was performed by <br /> EPA Methods 8015 (modified), EPA Method 3550, DHS Luft, and 8020 Analysis for <br /> oil and grease was performed by SM 5520 C & F Analysis for halogenated volatile <br /> 920-119 1A/RPT DOC A- i September 14, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.