My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006367
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2900 - Site Mitigation Program
>
PR0528433
>
ARCHIVED REPORTS_XR0006367
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:04:56 PM
Creation date
4/3/2020 4:42:57 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006367
RECORD_ID
PR0528433
PE
2957
FACILITY_ID
FA0019174
FACILITY_NAME
CHEVRON SERVICE STATION 9-6171
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741048
CURRENT_STATUS
02
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0�4n I <br /> SECOR www secor corn <br /> INTERNATIONAL 3017 Kilgore Road Suite 100 <br /> S E C ® R INCORPORATED Rancho Cordova CA 95670 <br /> 916-661-0400 TEL <br /> 1101 916-661-0430 FAx <br /> July 15, 2004 G�ECEN D <br /> Mike Infurna J U L 14 2004 <br /> San Joaquin County ENVIRONMENT HEALTH <br /> Environmental Health Division PERMIT/SERVICES <br /> 304 East Weber Avenue, Third Floor <br /> Stockton, California 95202 <br /> RE Chevron Groundwater Monitoring Report(2Q2004) <br /> Chevron Station 9-6171 <br /> 6633 Pacific Avenue <br /> F <br /> Stockton, California <br /> SECOR Project No 77CH 00000 23 0022 <br /> Dear Mr Infurna <br /> SECOR International Incorporated is providing this report to summarize the recently completed <br /> groundwater monitoring event at the above referenced site The site is a Chevron service station <br /> located at 6633 Pacific Avenue, Stockton, California <br /> COMPLETED ACTIVITIES - SECOND QUARTER 2004 <br /> ■ Conducted quarterly groundwater monitoring and sampling <br /> ■ Prepared and submitted quarterly groundwater monitoring report <br /> PLANNED ACTIVITIES --THIRD QUARTER 2004 <br /> ■ Conduct quarterly groundwater monitoring and sampling <br /> ■ Prepare and submit quarterly groundwater monitoring report <br /> DISCUSSION <br /> The quarterly monitoring and sampling was performed by Gettler-Ryan, Inc (G-R), on April 12 & 13, <br /> 2004 G-R's groundwater monitoring report is included as Attachment A Depth to groundwater <br /> across the site was approximately 41 feet below ground surface Groundwater elevation across the <br /> site increased an average of 0 92 feet from the previous sampling event Groundwater flow was to <br /> the southeast at a gradient of 0 01 to 0 02 ft/ft A summary of laboratory results are listed below <br /> !1Chevron196171Fenodic MonrtonngM0412Q2004 QMR 96171 doc SECOR International incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.