My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006369
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2900 - Site Mitigation Program
>
PR0528433
>
ARCHIVED REPORTS_XR0006369
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:07:42 PM
Creation date
4/3/2020 4:44:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006369
RECORD_ID
PR0528433
PE
2957
FACILITY_ID
FA0019174
FACILITY_NAME
CHEVRON SERVICE STATION 9-6171
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741048
CURRENT_STATUS
02
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOR wwwsecor.com <br /> INTERNATIONAL 3017 Kilgore Road,Suite 100 <br /> S E C 1\ INCORPORATED Rancho Cordova,CA 95670 <br /> 916-861.0400 TsL <br /> 916-861.0430 FAX <br /> January 14, 2004 <br /> Mike Infurna <br /> San Joaquin County <br /> Environmental Health Division <br /> 304 East Weber Avenue,Third Floor <br /> Stockton, California 95202 <br /> RE: Chevron Groundwater Monitoring Report(402003) <br /> Chevron Station 9-6171 <br /> 6633 Pacific Avenue <br /> Stockton, California <br /> SECOR Project No.: 77CH.00000.09.0017 <br /> Dear Mr. Infurna: <br /> SECOR International Incorporated is providing this report to summarize the recently <br /> completed groundwater monitoring event at the above referenced site. The site is a Chevron service <br /> station located at 6633 Pacific Avenue, Stockton, California. <br /> COMPLETED ACTIVITIES - FOURTH QUARTER 2003 <br /> ■ Conducted quarterly groundwater monitoring and sampling. <br /> ■ Prepared and submitted quarterly groundwater monitoring report. <br /> PLANNED ACTIVITIES— FIRST QUARTER 2004 <br /> • Conduct quarterly groundwater monitoring and sampling. <br /> ■ Prepare and submit quarterly groundwater monitoring report. <br /> DISCUSSION <br /> The quarterly monitoring and sampling was performed by Gettler-Ryan, Inc. (G-R). This <br /> groundwater monitoring and sampling event was performed on October 23 & 24, 2003. G-R's <br /> groundwater monitoring report is included as Attachment A. Depth to groundwater across the site <br /> was approximately 39 feet below ground surface. Groundwater elevation across the site decreased <br /> an average of 3.87 feet from the previous sampling event. Groundwater flow was to the southeast at <br /> an approximate gradient of 0.003 to 0.07 ft/ft. A summary of laboratory results are listed below. <br /> llkww <br /> 1.1ChevroM96171 Feriodic Monitoring120031402003 OMR 96171.doc SECOR International incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.