My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006371
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2900 - Site Mitigation Program
>
PR0528433
>
ARCHIVED REPORTS_XR0006371
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:12:08 PM
Creation date
4/3/2020 4:45:18 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006371
RECORD_ID
PR0528433
PE
2957
FACILITY_ID
FA0019174
FACILITY_NAME
CHEVRON SERVICE STATION 9-6171
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741048
CURRENT_STATUS
02
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECOR www secor com <br /> INTERNATIONAL <br /> S E C ® R INCORPORATED 3017 Kilgore Road Suite 100 <br /> Rancho Cordova CA 95670 <br /> 916 861-0400 TEL <br /> 916 861.0430 FAX <br /> July 7, 2003 RECE WE" <br /> Mike Infurna J U L 1 0 2003 <br /> San Joaquin County <br /> Environmental Health Division ENVIRONMENT HEALTH <br /> 304 East Weber Avenue, Third Floor PERMIT/SERVICES <br /> Stockton, California 95202 <br /> RE Chevron Groundwater Monitoring Report (2Q2003) <br /> Chevron Station 9-6171 <br /> 6633 Pacific Avenue <br /> Stockton, California <br /> SECOR Project No 77CH 00000 09 0017 <br /> Dear Mr Infurna <br /> SECOR International Incorporated is providing this report to summarize the recently <br /> completed groundwater-monitoring event at the above referenced site The site is a Chevron service <br /> station located at 6633 Pacific Avenue, Stockton, California <br /> COMPLETED ACTIVITIES - SECOND QUARTER 2003 <br /> Conducted quarterly groundwater monitoring and sampling I <br /> Prepared and submitted quarterly groundwater monitoring report <br /> PLANNED ACTIVITIES —THIRD QUARTER 2003 <br /> I <br /> ■ Conduct quarterly groundwater monitoring and sampling <br /> ■ Prepare and submit quarterly groundwater monitoring report <br /> DISCUSSION <br /> The quarterly monitoring and sampling was performed by Gettler-Ryan, Inc (G-R) This <br /> groundwater monitoring and sampling event was performed on April 15, 2003 G-R's groundwater <br /> monitoring report is Included as Attachment A Depth to groundwater across the site was <br /> approximately 38 feet below ground surface Groundwater elevation across the site increased an <br /> average of 0 54 feet from the previous sampling event Groundwater flow was to the southeast at an <br /> approximate gradient of 0 008 to 0 02 ft/ft A summary of laboratory results are listed below <br /> a <br /> t <br /> 11Chevron1981714Pertodtc Monitoring1200312Q2003 QMR 96171 doc SECOR lntetnattona!lncotporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.