My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006378
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2900 - Site Mitigation Program
>
PR0528433
>
ARCHIVED REPORTS_XR0006378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:12:51 PM
Creation date
4/3/2020 4:48:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006378
RECORD_ID
PR0528433
PE
2957
FACILITY_ID
FA0019174
FACILITY_NAME
CHEVRON SERVICE STATION 9-6171
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741048
CURRENT_STATUS
02
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d f <br /> Chevron Groundwater Monitoring Report(4Q2001) Page 2 of 2 <br /> Facility #9-6171 —6633 Pacific Avenue,Stockton,CA Date January 2,2002 <br /> DISCUSSION: <br /> This groundwater monitoring and sampling event was performed by Gettler-Ryan Inc on October 11,2001 Ten <br /> wells were monitored and sampled TPHg was detected in eight of the ten wells sampled at concentrations ranging <br /> from 60 gg/I in the sample collected from MW-14 to 1800 pg/l in the sample collected from MW-7 Benzene was <br /> detected in three wells at concentrations of 1 µg/l in the sample collected from MW-2, 1 1 pg/1 in the sample <br /> collected from MW-6, and 0 56 pg/l in the sample collected from MW-IID MtBE was detected in samples <br /> collected from two wells at concentrations of 4 8 pg/I in MW-6, and 560 pg/I in MW-8 The MtBE concentrations <br /> were confirmed through analysts by EPA Method 8260 Results of the confirmation analysts were less than the <br /> method detection limit of 2 0 pg/l in the sample collected from MW-6, and 670 pg/I in the sample collected from <br /> MW-8 MW-3, MW-5, and MW-9 were inaccessible due to cars parked over the wells Groundwater elevations <br /> increased across the site an average of approximately 0 74 feet this quarter Groundwater flow was calculated to be <br /> to the east at approximately 0 002 ft/ft <br /> LIMITATIONS: <br /> I <br /> The findings presented to this letter are based on data and interpretations provided by Gettler-Ryan, Inc Gettler- <br /> Ryan's report is attached The data presented in this summary is accurate only to the degree implied by the sources <br /> and methods used No warranty, expressed or implied, is made by SECOR <br /> If you have any questions, please feel free to call us at(916) 861-0400 <br /> Sincerely, <br /> SECOR International Inc <br /> Ro r Hoffmo <br /> Project Manager <br /> ATTACHMENTS• <br /> • Table 1 —Screen Intervals <br /> • Attachment A—November 14, 2001 Groundwater Monitoring& Sampling Report by Gettler-Ryan Inc <br /> cc Bob Cochran, Chevron Products Company, P O Box 6004, San Ramon,CA 94583-0804 <br /> Marty Hartzell, RWQCB-CVR, 3443 Routier Road, Suite A, Sacramento, CA 95827 <br /> Wilbur Smith ll, Sims-Grupe Management, 374 Lincoln Center, Stockton, CA 95207 <br /> Donald Bradshaw, Levine-Fricke-Recon, 1900 Powell Street, 12" Floor, Emeryville, CA 94608-1827 <br /> I <br /> I <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.