Laserfiche WebLink
Date July 13,2001SECOR <br /> t C international incorporated <br /> S <br /> E JU 1 P;l 2 26 <br /> CHEVRON GROUNDWATER MONITORING REPORT (2Q2001) <br /> Primary Agency Make Infurna <br /> San Joaquin County <br /> Environmental Health Division <br /> 304 East Weber Avenue,Third Floor <br /> Stockton,CA 95202 <br /> Facility No 9-6171 Address 6633 Pacific Avenue, Stockton,California <br /> CHEVRON Project Manager Robert Cochran <br /> Consulting Co/Contact Person SECOR International, Inc — William Brasher <br /> Consultant Project No 077 43461 014 <br /> Assembly Bill 681 Status Property Owner Chevron Products Company <br /> WORK PERFORMED THIS QUARTER: Second Quarter—2001: <br /> • 1 Conducted quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted groundwater monitoring report <br /> 3 Installed deep well MW-)1 D <br /> WORK PROPOSED FOR NEXT QUARTER: Third Quarter- 2001: <br /> l Conduct quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit groundwatir monitoring report <br /> 3 Prepare and submit assessment report <br /> QUARTERLY RESULTS SUMMARY: <br /> Current Phase of Project Monitoring and Sampling <br /> Frequency of Groundwater Sampling Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product(FP) Present On-Site No <br /> Current Remediation Techniques N/A <br /> Approximate Depth to Groundwater 33 5 to 34 feet <br /> Groundwater Gradient Northwest @ 0 005 to 0 02 ft/ft and Southeast @ 0 003 ft/ft <br /> 3017 Kilgore Road, Suite 100, Rancho Cordova, CA 95670 916 861 0400 916 861 0430 Fax www secor com <br />