My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006381
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2900 - Site Mitigation Program
>
PR0528433
>
ARCHIVED REPORTS_XR0006381
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:08:37 PM
Creation date
4/3/2020 4:50:26 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006381
RECORD_ID
PR0528433
PE
2957
FACILITY_ID
FA0019174
FACILITY_NAME
CHEVRON SERVICE STATION 9-6171
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741048
CURRENT_STATUS
02
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�� rr <br /> 4ZI GETTLER - RYAN INC. <br /> June 25, 2001 <br /> GR Job#385121 <br /> Mr Robert Cochran <br /> Chevron Products Company <br /> P O Box 6004 <br /> San Ramon,CA 94583 <br /> RE: Second Quarter Event of May 23 and 25, 2001 <br /> Groundwater Monitoring & Sampling Report <br /> Chevron Service Station #9-6171 <br /> 6633 Pacific Avenue <br /> Stockton, California <br /> Dear Mr Cochran <br /> This report documents the well development and the most recent groundwater monitoring and sampling event <br /> performed by Gettler-Ryan Inc (G-R) at the referenced site All field work was conducted in accordance with <br /> G-R Standard Operating Procedure- Groundwater Sampling(attached) <br /> Static groundwater levels were measured and the wells were checked for the presence of separate-phase <br /> hydrocarbons Static water level data, groundwater elevations, and separate-phase hydrocarbon thickness (if <br /> any) are presented in the attached Table i A Potentiometric Map is included as Figure <br /> Groundwater samples were collected from the monitoring wells and submitted to a state certified laboratory <br /> for analyses The field data sheets for this event are attached Analytical results are presented in the table(s) <br /> listed below A Concentration Map is included as Figure 2 The chain of custody document and laboratory <br /> analytical report are also attached <br /> Please call if you have any questions or comments regarding this report Thank you <br /> ncerely, <br /> OG <br /> Deanna L Harding <br /> Project CoordinatorQp� <br /> No 6882 <br /> Doug s J Lee d, <br /> Senior Geologist, R G No 6882 <br /> Figure 1 Potentiometric Map F CAI.�� <br /> Figure 2 Concentration Map <br /> Table 1 Groundwater Monitoring Data and Analytical Results <br /> Table 2 Groundwater Analytical Results <br /> Table I Groundwater Analytical Results <br /> Attachments Standard Operating Procedure-Groundwater Sampling <br /> Field Data Sheets <br /> Chain of Custody Document and Laboratory Analytical Reports <br /> 6747 Sierra Court , Suite J • Dublin , California 94568 ( 925 ) 551 -7555 <br />
The URL can be used to link to this page
Your browser does not support the video tag.