My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0006384
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6633
>
2900 - Site Mitigation Program
>
PR0528433
>
ARCHIVED REPORTS_XR0006384
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2020 1:07:57 PM
Creation date
4/3/2020 4:51:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0006384
RECORD_ID
PR0528433
PE
2957
FACILITY_ID
FA0019174
FACILITY_NAME
CHEVRON SERVICE STATION 9-6171
STREET_NUMBER
6633
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
APN
09741048
CURRENT_STATUS
02
SITE_LOCATION
6633 PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r� <br /> F SECOR <br /> Date February 5,2001 <br /> . 0/T" f=! PInternational Incorporated <br /> 3,? <br /> CHEVRON QUARTERLY GROUNDWATER MONITORING REPORT (3Q2000) <br /> Primary Agency Mike Infurna <br /> San Joaquin County <br /> Environmental Health Division <br /> 304 East Weber Avenue,Third Floor <br /> Stockton,CA 95202 <br /> Facility No 9-6171 Address 6633 Pacific Avenue, Stockton,California <br /> CHEVRON Project Manager Robert Cochran <br /> Consulting Co/Contact Person SECOR International,Inc —Roger Hoffmore <br /> Consultant Project No 077 41991 046 <br /> Assembly Bili 681 Status Property Owner Chevron Products Company <br /> WORK PERFORMED THIS QUARTER: Third Quarter--2000: <br /> . 1 Conducted quarterly groundwater monitoring and sampling <br /> 2 Prepared and submitted groundwater monitoring report <br /> WORK PROPOSED FOR NEXT QUARTER: Fourth Quarter' 2000: <br /> 1 Conduct quarterly groundwater monitoring and sampling <br /> 2 Prepare and submit groundwater monitoring report <br /> 3 Prepare and submit a work plan for additional assessment <br /> QUARTERLY RESULTS SUMMARY: <br /> Current Phase of Project Monitoring and Sampling <br /> Frequency of Groundwater Sampling Quarterly <br /> Frequency of Groundwater Monitoring Quarterly <br /> Is Free Product(FP)Present On-Site No <br /> Current Remediation Techniques N/A <br /> Approximate Depth to Groundwater 33 5 to 35 feet <br /> Groundwater Gradient North @ 0 03 f1ft <br /> 3017 Kilgore Road, Suite 100, Rancho Cordova, CA 95670 916 861 0400 916 861 0430 Fax www secor com <br />
The URL can be used to link to this page
Your browser does not support the video tag.