Laserfiche WebLink
STANDARD OPERATING PROCEDURE- <br />' GROUNDWATER SAMPLING <br />' Gettler-Ryan Inc field personnel adhere to the following procedures for the collection and handling of <br /> groundwater samples prior to analysis by the analytical laboratory Pnor to sample collection,the type of <br /> analysis to be performed is determined Loss prevention of volatile compounds is controlled and sample <br /> preservation for subsequent analysis is maintained <br /> Prior to sampling,the presence or absence of free-phase hydrocarbons is determined using an interface <br /> probe Product thickness,if present,is measured to the nearest 0 01 foot and is noted in the field notes <br /> In addition all depth to water level measurements are collected with a static water level indicator and are <br /> also recorded in the field notes, pnor to purging and sampling any wells <br /> After water levels are collected and prior to sampling, if purging is to occur, each well is purged a <br /> minimum of three well casing volumes of water using pre-cleaned pumps(stack,suction,Grundfos),or <br /> disposable bailers Temperature,pH and electrical conductivity are measured a minimum of three times <br /> during the purging Purging continues until these parameters stabilize <br /> Groundwater samples are collected using disposable bailers The water samples are transferred from the <br /> bailer into appropriate containers Pre-preserved containers supplied by analytical laboratories,are used <br /> • when possible When pre-preserved containers are not available,the laboratory is instructed to preserve <br /> the sample as appropriate Duplicate samples are collected for the laboratory to use in maintaining <br /> quality assurance/quality control standards The samples are labeled to include the job number,sample <br /> identification,collection date and time,analysis,preservation(if any),and the sample coIlector's initials <br /> The water samples are placed in a cooler, maintained at 4°C for transport to the laboratory Once <br /> collected in the field,all samples are maintained under chain of custody until delivered to the laboratory <br /> The chain of custody document includes the Job number,type of preservation,if any,analysis requested, <br /> sample identification,date and time collected, and the sample collector's name The chain of custody is <br /> signed and dated (including time of transfer) by each person who receives or surrenders the samples, <br /> beginning with the field personnel and ending with the laboratory personnel <br />' A laboratory supplied trip blank accompanies each sampling set For sampling sets greater than 20 <br /> samples, S%trip blanks are included The trip blank is analyzed for some oral]of the same compounds <br /> as the groundwater samples <br /> As requested by Chevron Environmental Management Company, the purge water and <br /> decontamination water generated during sampling activities is transported by IWM to Chemical <br /> Waste Management located in Kettleman Hili, California <br /> aN'C ahfornia'fonns�chc4-ron SDP JAN 2006 <br /> I <br /> I <br />